Acquisition of Historical High-Grade Copper Mine
Released
Released
Announcement PDF
ASX Announcement
30 October 2024
ASX: OD6
Acquisition of one of Australiaâs Highest-Grade,
Historical Copper Mines
OD6 Metals Limited (OD6 or the Company) is delighted to announce the proposed
acquisition of the Historic Gulf Creek Copper Projectâa high grade volcanogenic massive
sulphide (VMS) deposit located near the town of Barraba in New South Wales (the Gulf
Creek Project or Project).
Highlights:
â˘
High-Grade CopperâZinc VMS style deposit â historic underground mining averaged 2 to 6.5% Cu1
â˘
Mined over 100 years ago (1896-1912) - with +100m vertical and +300m strike open in multiple
directions
â˘
Mineralisation is associated with magnetite with geophysics showing repeat structures to the north
and west of existing Gulf Creek workings
â˘
Significant greenfields and brownfields exploration potential with over >3km of untested strike
in the immediate mine-stratigraphy, and over >10km across the tenement
â˘
Favourable deal metrics and structure based on $200k cash, and 6,000,000 shares, plus a deferred issue
of $200k shares (subject to shareholder approval) or cash on commencement of Phase 2 drill program
â˘
Strong near-term catalysts with exploration to commence imminently - fully permitted to drill Phase
1 program around the historical workings
Brett Hazelden, Managing Director, commented:
âOD6 has reviewed over 40 potential new projects and is pleased to announce that we have entered into binding
documentation to acquire the license over the historic Gulf Creek Copper mine and its surrounding area, in NSW.
The project was mined at the turn of the last century, between 1896 and 1912, with very high grades averaging
between 2 to 6.5% Copper within the three main lodes. Exploration prospectivity is immense as there has been no
modern exploration of substance since the mine closed, with only two drill holes completed more than 60 years ago.
We intend to apply modern exploration technologies and have identified the linkage between copper and magnetite
in the shallow historic workings. Based on a review of a recent 2021 drone magnetic survey there is potential of over
10km of untested magnetic VMS target horizon.
Copper is rapidly becoming a critical mineral in Australia, with NSW recently announcing a royalty deferral program
for developing critical minerals projects. OD6 is committed to rapidly advancing this early-stage prospect and the
opportunity to build a larger copper focussed portfolio.â
1
The Competent Person cautions that while the Mines Department records in this instance have been collected in
accordance with official provisions at the time, they are not absolute measures of the tenor or quantity of mineralisation.
The Competent Person considers that these records provide a reasonable indication of the tenor of grades and potential
volumes of mineralisation present.
1
Gulf Creek Copper Project Background
The Gulf Creek Project is a historic high-grade CopperâZinc, volcanogenic massive sulphide (VMS) style deposit
that was mined from underground over 100 years ago (1896-1912) to +100m vertical depth and +300m of
strike. Historic records 2 describe the mineralisation as occurring within three parallel sulphide zones:
â˘
Cornish Lode averaged 6% to 6.5% Cu
â˘
Middle Lode averaged 3% to 3.5% Cu
â˘
Big Lode averaged 2% to 2.5% Cu
Historic workings at the Gulf Creek Project will form the basis of initial exploration, the last drilling being two
holes, which were drilled in the 1960âs. As the Project has seen very little modern exploration and there are
numerous untested targets as well as potential for a larger and more expansive high-grade CuâZn system with
multiple repeat structures.
The exploration license, EL8492 (Tenement), covers an area of 2,375ha and is located near the town of Barraba,
approximately 400km by road to the port of Newcastle and 550km north of Sydney. The project geology sits
along the Peel Fault and encompasses the historic Gulf Creek and Murchison copper mines (see Figure 1).
Figure 1: Gulf Creek Project location and geological setting
2
Brown, R.E., Brownlow, J.W., & Kyrnen (1992). Metallogenic Study and Mineral Deposit Data Sheets: Manilla-Narrabri
1:250 000, SH/56/9, SH/55-12. Geological Survey of New South Wales (319p) (Gulf Creek referenced p.26).
These average grades were not reported in accordance with the provisions of the JORC Code or its precedents and the
Competent Person advises appropriate caution be exercised on the part of investors, potential investors or their advisers.
The Competent Person considers that the reported grades are indicative of but not absolute measures of the tenor of
mineralisation present at Gulf Greek.
2
The Project sits in a classic setting for Besshi Style Volcanogenic Massive Sulphide Deposit (VMS). This SilurianDevonian age geologically is analogous to the Woodlawn Deposit (>20Mt @ 1.6% Cu, 9.1% Zn endowment) 3
owned by Develop Global Ltd.
Initial Exploration Focus â Gulf Creek Historical Workings
A Phase 1 program has been designed to test the area in and around the historical workings and is fully
permitted to commence during early 2025. The permitted program consists of a 14 hole, 1,500 to 3,000m
diamond or RC drill program.
OD6 will investigate the use of downhole geophysics as a suitable targeting technique for mineralisation within
100m of drill holes.
The Company will examine re-processing and reinterpretation of Induced Polarisation (IP) and drone magnetics
with the latest modeling techniques.
A new drone geophysical survey across the whole tenement will also be considered.
Figure 2: Gulf Creek Historical Workings. Oblique schematic view north
1.
https://portergeo.com.au/database/mineinfo.asp?mineid=mn295
3
Extensional Exploration Near Gulf Creek
The CuâZn mineralisation has a strong association between magnetite and massive sulphide units. This
association has been studied by students at the University of New England.4 This relationship permits use of
magnetic geophysics to identify targets that can be further tested with further geophysics and drilling.
A 2021 drone magnetics survey, shown in Figures 3 and 4 matches known mineralisation over +300m strikelength of the historic ore-body, and identified additional magnetic anomalies which may contain sulphide
bodies.
Induced Polarisation (IP) Chargeability geophysics, to potentially map subsurface sulphide minerals, has been
utilised in a small area surrounding the historic workings with results being coincident with extensional magnetic
targets to the northwest.
The extended magnetic survey in Figure 3, indicates a series of NW plunging folds providing >3km of local
strike length of target high grade magnetite-VMS target horizons within the Gulf Creek Syncline.
The Competent Person cautions that this geophysical work is used to map potentially magnetic minerals
(magnetic survey) or sulphide minerals (IP chargeability survey), and that subsequent physical sampling may not
return results of economic interest.
Drilling in this area is planned as part of a future Phase 2 program.
Figure 3: Gulf Creek historical workings with 1VD Magnetic and IP data showing potential target extensions
4 McCarron,. J., The Geochemistry of Silurian/Devonian Cherts of Djungati Terrane, NSW and their Implications for Volcanogenic Massive Sulphide
Deposits. 1991. University of New England, Armidale, NSW, BSc. Hons Thesis
4
Regional Exploration Potential
The 2021 drone magnetics survey was extended north to the historic Murchison Mine, which is also associated
with magnetic stratigraphy, as seen in Figure 4, and reported with copper grades up to 4%.5
There appears to be significant folded magnetic stratigraphy completely untested with potentially over
>10km of magnetic VMS target horizon.
Further follow up geophysics and drilling in this area is planned as part of a future program.
Figure 4: Gulf Creek regional 1VD Magnetic and potential untested targets
5
Refer: Comet Resources Press Release (13/01/2021)
5
Forward Works Program
Works underway
â˘
Geophysics reprocessing and interpretation
â˘
Check sampling / assays
â˘
Integration of historic data and information into database
Remaining 2024
â˘
Reconnaissance mapping and sampling
â˘
Planning (and implementation) of surface geochemistry surveys
â˘
Planning of extended geophysical survey â drone or ground-based
Next calendar year
â˘
Q1 2025 Phase 1 drilling program and downhole electromagnetics
â˘
First drill assay results from Phase 1 drilling program at Gulf Creek
â˘
Planning, permitting and implementation of Phase 2 drilling
6
Appendix â Terms of Acquisition of the Gulf Creek Project
The Company, together with wholly owned subsidiary, Gulf Creek Copper Pty Ltd (Buyer), has entered into a tenement
sale agreement with Mr Jonathan Downes (Seller), the current 100% owner of the Tenement, to acquire a 100% legal
and beneficial interest in the Project (Acquisition Agreement). The Seller is not a related party of the Company nor a
shareholder in the Company.
The Acquisition is subject to certain conditions, in particular ministerial approval for the transfer of the Tenement from
the Seller to the Buyer which is anticipated to take up to 4 months (Ministerial Approval Period).
Key terms outlined below:
1.
Consideration
Subject to satisfaction (or waiver) of the conditions, the consideration payable by the Company for the Acquisition is
comprised of:
(i)
payment of a non-refundable cash deposit of $50,000 (exclusive of GST) to the Seller upon execution of the
Acquisition Agreement;
(ii)
at Completion:
(iii)
(A)
payment of $150,000 (exclusive of GST) to the Seller in immediately available funds (Completion
Cash Consideration); and
(B)
the Company issuing 6,000,000 fully paid ordinary shares in the capital of the Company (OD6
Shares) pursuant to the Companyâs placement capacity under Listing Rule 7.1 (Completion
Consideration Shares); and
post Completion, and subject to the satisfaction of the Deferred Milestone (see section 3 below), the
Company will either:
(A)
subject to the approval of the Companyâs shareholders pursuant to Listing Rule 7.1, issue such
number of OD6 Shares to the Seller (or its nominee) with a deemed value of $200,000 based on the
volume weighted average price of OD6 Shares traded on ASX during the 10 trading days on which
sales in OD6 Shares were recorded on ASX ending on the date that the Deferred Milestone is
satisfied (Deferred Consideration Shares); or
(B)
if, after seeking shareholder approval for the issue of Deferred Consideration Shares, OD6 does not
receive the requisite shareholder approval for issue of such OD6 Shares, a cash payment by the
Company of $200,000 to the Seller in immediately available funds (Deferred Cash Consideration),
payable within 5 Business Days of the applicable OD6 shareholder meeting,
(Deferred Consideration),
(together, the Consideration).
The Company must seek shareholder approval to issue the Deferred Consideration Shares within 60 days of
satisfaction of the Deferred Milestone (or such later date agreed by the Seller).
7
2.
Voluntary Escrow
The Completion Consideration Shares are subject to a voluntary escrow period of 12 months from the date of issue
(Completion Share Escrow Period).
If Deferred Consideration Shares are issued, they will be subject to voluntary escrow for the greater of:
(i)
any remaining Completion Share Escrow Period; and
(ii)
4 months from the date of issue of the Deferred Consideration Shares.
3.
Deferred Milestone
The Deferred Consideration will be payable upon an announcement by the Company to ASX that it has commenced a
second phase of drilling in respect of the Gulf Creek Project (Deferred Milestone).
The second phase of drilling will be taken to have commenced upon remobilisation of a drill rig occurring on the
Tenement following completion of an agreed initial drilling program or, in the event drilling following completion of
the Initial Drilling Program is continuous, when total drilling by the Company on the tenement has exceeded 2,500m.
The Company must make the announcement to ASX as soon as reasonably practicable following satisfaction of the
Deferred Milestone.
4.
Conditions Precedent
Completion of the Acquisition is conditional upon satisfaction (or waiver) of the following conditions precedent
(Conditions):
(i)
the Seller obtaining ministerial approval in accordance with the Mining Act 1992 (NSW) for the transfer of a
100% beneficial and legal interest in the Tenement to the Buyer, such consent being unconditional or subject
only to the conditions imposed on the Buyer which are acceptable to the Buyer (acting reasonably);
(ii)
the Seller obtaining all other Government Agency consents and approvals reasonably necessary for the
transfer of the Tenement to the Buyer;
(iii)
the Seller obtaining all Government Agency approvals (including, the approval of a review of environmental
factors by the Department) and all applicable heritage clearances reasonably necessary for an initial drilling
program (Initial Drilling Program) to be commenced on the Tenement on the terms of an existing
Assessable Prospecting Operation (APO) approval applicable to the Tenement. For the avoidance of doubt, if
the Buyer requires any amendments to the APO to conduct the Initial Drilling Program, the Buyer is
responsible for seeking approval of any such amendments (provided that the Seller will provide reasonable
assistance to the Buyer with respect to lodging any such amended APO and communicating with the
Department in respect of the amended APO); and
(ii)
the Seller entering into a voluntary escrow deed in respect of the Completion Consideration Shares.
If the above Conditions are not satisfied within 6 months from the date of the Acquisition Agreement, either the
Company or the Seller may terminate the Acquisition Agreement.
8
5.
Pre-Completion Exploration
On and from the date of the Acquisition Agreement until the date of Completion (inclusive) the Seller (to the extent it
is legally able to do so) has granted the Buyer (acting through its employees, consultants and representatives):
(i)
a licence to (at OD6/the Buyerâs sole cost):
(A)
access and travel over the Tenement and bring vehicles, plant and machinery on to the Tenement;
(B)
take samples, including bulk samples, from the Tenement;
(C)
use all applicable mining information; and
(D)
do all things the Seller is lawfully entitled to do on the Tenement,
to the extent such activities can be lawfully undertaken by the owner of the Tenement; and
(ii)
the exclusive right (but not obligation), at OD6/the Buyerâs sole cost, to carry out exploration activities
(including, for the avoidance of doubt, the right to carry out an initial drilling program on the Sellerâs behalf)
in accordance with all approvals obtained by the Seller (Pre-Completion Activities), which the Buyer may
determine (in consultation with the Seller) the nature, location, timing and conduct of all exploration activities
provided that it acts in accordance with good and generally accepted exploration practices,
and the Seller will provide all reasonable assistance to the Buyer for the purpose of procuring any Department
approvals or other approvals required for the Buyer to lawfully carry out Pre-Completion Activities.
6.
Guarantee
The Company has agreed to guarantee the various obligations of the Buyer under the Acquisition Agreement.
9
Competent Persons Statement
Information in this report relating to Exploration Results is based on information reviewed by Jeremy Peters, who is a
Fellow of the Australasian Institute of Mining and Metallurgy and a Chartered Professional Geologist and Mining
Engineer of that organisation. Mr Peters is an independent consultant of Burnt Shirt Pty Ltd and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for
reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Peters consents to the inclusion of the data
in the form and context in which it appears.
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to be
forecasts, forward looking statements, or statements about the future matters for the purposes of the Corporations
Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects are forward looking
statements and can generally be identified by the use of words such as âprojectâ, âforeseeâ, âplanâ, âexpectâ, âaimâ,
âintendâ, âanticipateâ, âbelieveâ, âestimateâ, âmayâ, âshouldâ, âwillâ or similar expressions. There can be no assurance that
the OD6 Metals plans for its projects will proceed as expected and there can be no assurance of future events which
are subject to risk, uncertainties and other actions that may cause OD6 Metals actual results, performance, or
achievements to differ from those referred to in this document. While the information contained in this document has
been prepared in good faith, there can be given no assurance or guarantee that the occurrence of these events
referred to in the document will occur as contemplated. Accordingly, to the maximum extent permitted by law, OD6
Metals and any of its affiliates and their directors, officers, employees, agents and advisors disclaim any liability
whether direct or indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of, the accuracy,
reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-looking
statement or any event or results expressed or implied in any forward-looking statement; and do not make any
representation or warranty, express or implied, as to the accuracy, reliability or completeness of the information in this
document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in
any forward-looking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence).
No new information
Information in this report relating to Exploration Results is based on information reviewed by Mr Jeremy Peters who is
a Fellow of the Australasian Institute of Mining and Metallurgy and a Chartered Professional Geologist and Mining
Engineer of that organisation. Mr Peters is a Director of Burnt Shirt Pty Ltd, consulting to OD6 and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for
reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Peters consents to the inclusion of the data
in the form and context in which it appears.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted from
the Companyâs ASX announcements dated 29 May 2024. OD6 confirms that it is not aware of any new information or
data that materially affects the information included in the original announcement and that all material assumptions
and technical parameters underpinning the Mineral Resource estimate continue to apply.
This announcement has been authorised for release by the Board of OD6 Metals Limited
10
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration
and development opportunities within the critical mineral sector.
The Company has successfully identified clay hosted rare earths at
its 100% owned Splinter Rock and Grass Patch Projects, which are
located in the Esperance-Goldfields region of WA - about 30 to
150km northeast of the major port and town of Esperance.
REE are becoming increasingly important in the global economy,
with uses including advanced electronics and permanent magnets
electric motors in electric vehicles, wind turbines and robotics.
An updated Mineral Resource Estimate (MRE) for the flagship
Splinter Rock Rare Earths Project was released in May 2024 and has
confirmed that Splinter Rock hosts the largest and highest-grade
clay-hosted rare earths deposit in Australia with a Resource of 682Mt @ 1,338ppm TREO.
The Splinter Rock MRE indicates that high-value Magnetic Rare Earths (MagREE) such Neodymium (Nd), Praseodymium (Pr),
Dysprosium (Dy) and Terbium (Tb) represent ~23% of the deposit.
Metallurgical testing using hydrochloric acid to leach the rare earths have resulted in positive REE recoveries with
optimisation ongoing. The Inside Centre Prospect is a main focus of the company given its metallurgical recoveries, high
grade, low strip ratio and its considerable thickness.
As part of the exploration process the Company has entered into heritage agreements with Esperance Tjaltrjraak Native Title
Aboriginal Corporation and the Ngadju Native Title Aboriginal Corporation that serves to both enable exploration and protect
important cultural sites on Country.
Corporate Directory
Managing Director
Mr Brett Hazelden
Non-Executive Chairman
Wayne Bramwell
Non-Executive Director
Dr Darren Holden
Non-Executive Director
Mr Piers Lewis
Non-Executive Director
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Mr Troy Cavanagh
Joint Company Secretary
Mr Joel Ives
Contact
Investor Relations
OD6 Metals Ltd
Lucas Robinson
ACN 654 839 602
Corporate Storeytime
www.od6metals.com.au
lucas@corporatestorytime.com
Mail to: info@od6metals.com.au
Phone: +61 408 228 889
Phone: +61 8 6189 8515
Level 1, 50 Kings Park Road, West Perth, WA 6005
PO Box 277, North Beach, WA 6920
PO Box 2009, Esperance, WA 6450
11
JORC 2012 â Table1: Gulf Creek
Section 1 Sampling Techniques and Data
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Sampling techniques
â˘
â˘
â˘
â˘
â˘
Drilling techniques
â˘
Drill sample recovery
â˘
â˘
â˘
Logging
â˘
â˘
â˘
Sub-sampling techniques
and sample preparation
â˘
â˘
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where âindustry standardâ work has been
done this would be relatively simple (eg âreverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assayâ). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant
disclosure of detailed information
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented
and if so, by what method, etc).
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
Reference to copper and zinc grades are based on
historic reports noted in:
Peters, J. 2023. Independent Geologists Report for
Comet Resources Ltd. Burnt Shirt Pty Ltd.
Brown, R., 1987. Preliminary Geological Notes for the
Manilla 1:250,000 sheet. Geological Survey of New South
Wales, Report GS1987/003.
Brown, R.E., Brownlow, J.W., & Kyrnen (1992).
Metallogenic Study and Mineral Deposit Data Sheets:
Manilla-Narrabri 1:250 000, SH/56/9, SH/55-12.
Geological Survey of New South Wales (319p) (Gulf
Creek referenced p.26)
Byass, A. and Thompson, A., 2012. Gulf Creek CopperZinc Deposit â Scoping Study March 2012. Unpublished
Report prepared by Clonaig Consulting for Corazon
Mining Limited. (reported in Annual Report for EL6492
available NSW government portal)
Other references noted in the reference list.
â˘
Samples and exploration reported in previous studies
and reports are considered historic in nature and are
yet to be verified by the Company. The details and
verification are not necessarily available, however,
based on multiple reports with similar assessments,
historic results are considered generally reliable in the
context in which they have been presented. Further
verification is underway by the Company.
â˘
No drilling results reported in this release.
â˘
No drilling results reported in this release.
â˘
No drilling results reported in this release.
â˘
â˘
No drilling results reported in this release.
Samples and exploration reported in previous studies
and reports are considered historic in nature and are
12
Criteria
JORC Code explanation
â˘
â˘
â˘
â˘
Quality of assay data and
laboratory tests
â˘
â˘
â˘
Verification of sampling
and assaying
â˘
â˘
â˘
Location of data points
â˘
â˘
Data spacing and
distribution
â˘
â˘
â˘
â˘
Orientation of data in
relation to geological
structure
â˘
â˘
â˘
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
yet to be verified by the Company. The details and
verification are not necessarily available, however,
based on multiple reports with similar assessments,
historic results are considered generally reliable in the
context in which they have been presented. Further
verification is underway by the Company.
â˘
Samples and exploration reported in previous studies
and reports are considered historic in nature and are
yet to be verified by the Company. The details and
verification are not necessarily available, however,
based on multiple reports with similar assessments,
historic results are considered generally reliable in the
context in which they have been presented. Further
verification is underway by the Company.
â˘
No drilling results reported in this release.
â˘
â˘
No drilling results reported in this release.
Grid system is MGA 94 Zone 56
â˘
No spaced data is reported other than geophysical
data. Refer below.
â˘
No assay sampling reported, other than historic results
as previously noted.
With reference to magnetic data â flightlines were
flown on an orientation 045 degrees (NE-SW), which is
orthogonal to the principal geological structure
With reference to IP Geophysics â lines were oriented EW, which is approximately a 45 degree angle to the
principal NW-SE oriented geological structure.
â˘
â˘
Sample security
â˘
The measures taken to ensure sample security.
â˘
Samples reported by previous studies are considered
historic in nature and are yet to be verified by the
Company. The security of samples
Share your feedback
Discover