Down Hole EM Survey Identifies Off Hole Conductors
Released
Released
Announcement PDF
ASX Announcement
23 January 2026
ASX: OD6
1
Down Hole Electromagnetic Survey
Identifies Off Hole Conductors at Gulf Creek
OD6 Metals Limited (OD6 or the Company) is pleased to advise that processing andinterpretation of
the Downhole Electromagnetic (DHEM) survey completed in December 2025 has identified a strong
off-hole conductors at the Gulf Creek Copper Project in northern New South Wales.
The newly identified strong conductor is located proximal to historic high-grade copper workings and
represents a compelling new drill target, supporting the potential for fault-offset or stacked
mineralised lodes beneath the historic mine.
Highlights
• DHEM surveying results complete across six drill holes using four surface EM loops
• Strong conductor identified approximately 75m beyond the end of hole GDD010
• Geological reinterpretation indicates a potential fault offset of historic high-grade lodes mined
• DHEM results at the Northwest Target indicates a possible additional conductor
• Drill assay results pending from the recent diamond drilling program
• OD6 fully permitted for additional 25 holes at Gulf Creek follow up drilling
Figure 1: Cross-section SE-NW across Gulf Creek showing plate conductors
2
Managing Director Brett Hazelden, commented:
“The DHEM survey and subsequent modelling has provided confidence that there are significant undiscovered
accumulations of mineralization proximal to the historic high-grade copper mine at Gulf Creek.
Both our near-mine drilling and historic records indicate the presence of high grade copper, and this combined with
the increased knowledge of mine-stratigraphy and the newly identified conductor located beyond end-of-hole,
strongly suggests there is a structural fault off-set of the main lode.
With drilling now logged and geological understanding significantly advanced, we believe this conductor represents
a high-priority target at depth and reinforces the prospectivity of the project.”
What is DHEM?
Downhole Electromagnetics (DHEM) is a geophysical method where an electromagnetic field is transmitted
from a surface loop and measured by a probe lowered down a drill hole. Because copper sulphides
(chalcopyrite, bornite, chalcocite) are significantly more conductive than surrounding host rocks, the DHEM
tool can detect:
• Off-hole conductors, potentially massive sulphide bodies, not intersected by drilling
• Down-dip, up-dip or along-strike extensions of mineralised lodes
• Potential stacked or parallel lenses hidden from surface geophysics
• Depth and orientation of conductive bodies to improve drilling accuracy
DHEM is considered one of the most effective tools for vectoring toward massive sulphide accumulations,
particularly in structurally complex or historically mined VMS systems such as Gulf Creek. DHEM can detect
conductors at 50 to 100m from the drill hole.
Downhole Electromagnetic (DHEM) Surveying Program Overview
A total of four EM surface loops were laid out over key target areas at Gulf Creek with six holes. This included 3
holes at Gulf Creek, and one hole each at the Big Bend, West Limb and Northwest Target areas (Figure 2).
Results confirmed conductors associated with known high-grade mineralization proximal to the historic
workings as seen in the upper areas of Figure 1.
A strong off-hole conductor was detected beyond the end of hole GDD010 as indicated in Figure 1. Hole
GDD010 was drilled as a deep hole (EOH 328m) beneath the historic workings. Whilst the hole intersected only
minor sulphide horizons it also did not intersect the known mine-stratigraphy including the main hanging-wall
exhalite/jaspilite or the footwall basalt. The top part of the hole included silicified material, potentially
indicating a fault zone. This suggests that there is a potential fault off-set, that steps mineralisation to
the SW from a fault currently inferred to strike, parallel with the Gulf Creek syncline and dipping to the
SW.
DHEM Results from the Northwest target indicate a possible conductor, though in consultation with Mitre
Geophysics, it requires further geological consideration before testing.
DHEM at Big Bend and Western Limb did not yield appreciable off-hole conductors (Table 1).
3
Figure 2: Gulf Creek DHEM Survey Design
Table 1: DHEM Summary Results / Drill Hole Details. All coordinates in GDA94 Zone 56
Hole ID East North RL
Hole
Depth
Dip Azi Loop/Target Results
GCC0004 277058 6657414 766 242 -55.0 232.8 Gulf Creek
Conductors proximal to
historicworkings
GCC0005 277088 6657341 761 200 -50.0 258.8 Gulf Creek
Conductors proximal to
historicworkings
GCDD007 276791 6657547 798 240.5 -75.7 227.9 Big Bend No Significant Results
GCDD008 276400 6658126 789 240.5 -60.1 223.3 NorthWest Potential Conductor
GCDD009 276160 6657703 813 240.5 -55.2 116.0 West Limb No Significant Results
GCDD010 277038 6657457 759 328 -66.9 229.0 Gulf Creek Conductor 75m off end
4
Figure3: Plan viewof OD6 Drilling completed to date overlain on 1st
vertical derivativeof magnetics with the priority targets Big
Bend, North West, West Limb and the historic Gulf Creek Mine
Next Steps
• Receipt of assay results from the recent diamond drilling program
• Integrated interpretation of DHEM, geology, surface geochemistry and geophysics
• Design of follow-up drill holes to test identified conductors
• Advancement of priority targets ahead of the next drilling phase
• OD6 remains fully permitted for an additional 25 drill holes at Gulf Creek
5
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration and development opportunities within the
critical minerals sector, namely rare earths and copper.
Rare Earth Elements
OD6 Metals has successfully identified clay hosted rare earths at its 100% owned Splinter Rock Project which is
located in the Esperance-Goldfields region of Western Australia.
The Company released a Mineral Resource Estimate (MRE) for Splinter Rock in May 2024, confirming that the
project hosts one of the largest and highest-grade clay-hosted rare earths deposits in Australia with an
Indicated Resource of 119Mt @ 1,632ppm TREO and an Inferred Resource of 563Mt @ 1,275ppm TREO with an
overall ratio of ~23% high-value Magnetic Rare Earths (MagREE).
An innovative Process Flow sheet has been selected utilising Heap Leaching, Nano-filtration and Ion Exchange
Technologies that have achieved ~75% Nd & Pr overall recovery, produced a high-quality Mixed Rare Earth
Carbonate or Hydroxide (MREC/H) of ~56-59% TREO, with low levels of impurities (Al, Fe, P, Si) and extremely
low uranium and thorium content (<0.001% U + Th).
OD6 Metals believes that Splinter Rock has all the hallmarks of a world class rare earths project with a
conceptual heap leach development which utilises the large and high-grade Splinter Rock resource to support a
long-life REE operation.
Copper
The Company is advancing the Gulf Creek Copper-Zinc VMS Project located near the town of Barraba in NSW.
Gulf Creek was mined at around the turn of the 20th century and was once regarded as the highest-grade
copper mine (2% to 6.5% Cu) in NSW until its closure due to weak copper prices in 1912. Very little exploration
has occurred at the project in over 100 years, with OD6 aiming to apply modern day exploration technologies.
The 2025 maiden drilling program successfully defined high grade copper below the historical mine plus
confirmed the strong relationship between magnetism and massive sulphide mineralisation. Geophysical
modelling has identified multiple, high priority and untested targets ready for drilling providing over >3km of
untested strike in the immediate mine-stratigraphy, and over >10km across the tenement.
Corporate Directory
Managing Director
Non-Executive Chairman
Non-Executive Director
Financial Controller/ Joint Company Secretary
Joint Company Secretary
Contact
OD6 Metals Ltd
ACN 654 839 602
www.od6metals.com.au
Mail to: info@od6metals.com.au
Phone: +61 8 6189 8515
Level 1, 1 Alvan Street, Subiaco, WA 6008
Mr Brett Hazelden
Mr Piers Lewis
Dr Mitch Loan
Mr Troy Cavanagh
Mr Joel Ives
Investor Relations
Lucas Robinson
Corporate Storytime
lucas@corporatestorytime.com
Phone: +61 408 228 889
6
Competent Persons Statement
Information in this report relating to Exploration Results is based on information reviewed by Dr Darren Holden
who is a Fellow of the Australasian Institute of Mining and Metallurgy. Dr Holden is an employee of GeoSpy Pty
Ltd and is geological advisor to the Company and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined by the 2012 Edition of the Australasian Code for reporting of Exploration Results,
Mineral Resources and Ore Reserves. Dr Holden owns shares in the Company and participates in the Company’s
employee securities incentive plan. Dr Holden consents to the inclusion of the data in the form and context in
which it appears.
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to
be forecasts, forward looking statements, or statements about the future matters for the purposes of the
Corporations Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects
are forward looking statements and can generally be identified by the use of words such as ‘project’, ‘foresee’,
‘plan’, ‘expect’, ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. There
can be no assurance that the OD6 Metals plans for its projects will proceed as expected and there can be no
assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6 Metals
actual results, performance, or achievements to differ from those referred to in this document. While the
information contained in this document has been prepared in good faith, there can be given no assurance or
guarantee that the occurrence of these events referred to in the document will occur as contemplated.
Accordingly, to the maximum extent permitted by law, OD6 Metals and any of its affiliates and their directors,
officers, employees, agents and advisors disclaim any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward-looking statement or any event or
results expressed or implied in any forward-looking statement; and do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this document, or
likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward-looking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence).
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted
from the Company’s ASX announcements dated 18 July 2024. OD6 confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply.
This announcement has been authorised for release by the Board of OD6 Metals Limited
7
JORC 2012 – Table1: Gulf Creek
Section 1 Sampling Techniques and Data
(Criteria listed in the preceding section also apply to this section)
Criteria JORC Code explanation Commentary
Sampling techniques • Nature and quality ofsampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples shouldnotbe takenas limitingthe
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibrationofany measurement tools or systems
used.
• Aspects ofthe determination ofmineralisation that
are Material to the Public Report.
• In cases where ‘industrystandard’ work has been
done this would be relatively simple (eg ‘reverse
circulationdrilling was used to obtain 1 m samples
from which 3 kgwas pulverised toproduce a 30 g
charge for fire assay’). In other cases more
explanationmay be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant
disclosure of detailed information
• No sampling reported in this release.
• All drilling, as yet un-cutandassayed, is diamond core
drilling, andit is anticipatedthat selected samples will
be cut-half core and assayed.
Drilling techniques • Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
samplingbitor other type, whether core is oriented
and if so, by what method, etc).
• Diamond core drilling NQ.
Drill sample recovery • Method ofrecordingand assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade andwhether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Some zones ofbroken core andpotential core loss were
noted, however, overall core recovery expected at
>95%
Logging • Whether core and chip samples have been
geologically andgeotechnically logged toa level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• All core logged onsite by contractgeologists recording
lithology, alteration, structure and magnetic
susceptibility.
Sub-sampling techniques
and sample preparation
• Ifcore, whether cut or sawn and whether quarter,
half or all core taken.
• Ifnon-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
• No samplingor sub-samplingreported in this release.
8
Criteria JORC Code explanation Commentary
Quality of assay data and
laboratory tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysicaltools,spectrometers,handheldXRF
instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature ofqualitycontrol procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels ofaccuracy
(ie lack of bias) and precision have been
established.
• No new assay results reportedin this release. Refer to
assays reported previously on 7 May 2025.
• DHEM conducted by GAP Geophysics, with data
modelled by Mitre Geophysics ltd
• Transmitter was a GAP KPTX-80 (703)
• Loop was single turn 35mm2double insulated copper
Verification of sampling
and assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No new assay results reported in this release.
Location of data points • Accuracy and quality ofsurveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used inMineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• All drill collars sighted using hand held GPS with
accuracy of +- 5m.
• Downhole surveys conducted usingOmni Gyro tool by
the drill team.
• Results presented in GDA94 Zone 56.
Data spacing and
distribution
• Data spacing forreportingofExploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree ofgeological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Drill spacing is variable.
Orientation of data in
relation to geological
structure
• Whether the orientation of sampling achieves
unbiased samplingofpossible structures and the
extent to which this is known, considering the
deposit type.
• Ifthe relationshipbetween the drilling orientation
and the orientation ofkey mineralised structures is
considered tohave introduced asamplingbias, this
should be assessed and reported if material.
• Drilling oriented orthogonal to the stratigraphy
Sample security • The measures taken to ensure sample security. • All core is securely stored on site and is being reviewed
Audits or reviews • The results of any audits or reviews of sampling
techniques and data.
• Collection of geological data from drilling has been
reviewed and overseenby Core Geoscience PtyLtd and
GeoSpy Pty Ltd.
• Geophysical data was modelled by an independent
consultant, namely Kate Hine at Mitre Geophysics.
9
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location and
ownership including agreements or materialissues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reportingalongwith any known impediments to
obtaining a licence to operate in the area.
• The GulfCreek Project EL8492 is listed on the Mining
Titles Registrar ofNSWunder the GulfCreek Copper Pty
Ltd, a wholly owned subsidiary of OD6 Metals..
• GulfCreek Copper Pty Ltd the sole 100% holder of the
exploration license. The license was renewed on
18/03/2024 is valid until 21/12/2029.
• Other than state royalties, there is no overriding
royalties on the project.
• The license overlaps both crown land (being the area
principally ofthe historicmine) and private farmland.
Private land holders in the area have previously
consented to explorationactivityon theirland,and the
Company knows noreason why on-going land access
cannot be granted.
• The land falls in the area of claimants – the Gomeroi
people. On private land, the native title has been
extinguished. The area ofCrownland was subject to a
ruling 31/03/2022 and that Native Title is effectively
extinguished for the purposes of exploration. Further
consents may be required prior to mining.
• Heritage – areas subject to future ground disturbing
work are subject to the NSW Mineral Industry Due
Diligence Code of Practice for the Protection of
Aboriginal Objects 2010.
• Historical archaeological sites are protected under the
NSW Heritage Act (1977), which may be applicable to
historic buildings and structures, including the presence
of historic mine and smelter workings.
• Refer to ASX announcement 21March 2025 regarding
NSW Resources Regulator Notice
Explorationdone by other
parties
• Acknowledgmentandappraisal of exploration by
other parties.
• The GulfCreek mine has been subject to intermittent
explorationfor more than 100 years. In recent times,
reconnaissance andgeophysical surveys were carried
out. Refer to ASX announcement 30October 2024 for
details.
Geology • Deposit type, geological setting and style of
mineralisation.
• Base metal (copperandzinc) mineralisation occurs is
massive to semi-massive sulphides principally
chalcopyrite and sphalerite. The mineralisation is
closely associated with magnetite.
• Mineralisation is hosted in a series of cherts,
(sedimentary radiolarian and exhalative) siltstones and
basalts ofthe Bob’s Creek Formation. The Bob’s Creek
formationis underlain bythe WoodsreefFormation-an
ophiolite sequence including harzburgite, dunite and
gabbro.
• Mineralisation is considered to be ‘Besshi Style’
Volcanogenic Massive Sulphide (VMS) deposit
• The sedimentary sequence,ofwhichthe mineralisation
is parallel, has been folded into NW-SE striking and
steeply dipping folds.
• At the historicGulfCreek mine, mineralisation strikes
NW-SE and is steeply dipping(70-85degrees) to the NE.
Drill hole Information • A summary of all information material to the
understanding ofthe explorationresults including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• All drill results are reported tothe ASX in line with ASIC
requirements.
• A summary ofmaterialdrillhole information is included
in the Drill Hole Data table included in this release.
• No material has been excluded.
10
Criteria JORC Code explanation Commentary
• Ifthe exclusion of this information is justified on
the basis that the informationis not Material and
this exclusion does not detract from the
understanding ofthe report, the CompetentPerson
should clearly explain why this is the case.
Data aggregation methods • In reporting Exploration Results, weighting
averagingtechniques, maximumand/or minimum
grade truncations (eg cuttingof high grades) and
cut-offgrades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short
lengths ofhighgrade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples ofsuch aggregations should be shownin
detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• No data aggregation reported in this release.
Relationship between
mineralisationwidths and
intercept lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• Ifthe geometry ofthe mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• Ifit is not known and only the down hole lengths
are reported, there shouldbe a clear statement to
this effect (eg ‘down hole length, true width not
known’).
• No intercept or mineralization widths reported.
Diagrams • Appropriate maps and sections (with scales) and
tabulations ofintercepts should be includedfor any
significant discoverybeing reported. These should
include, but notbe limited to a plan view of drill
hole collar locations and appropriate sectional
views.
• Diagrams are included at relevant sections in this
Report
Balanced reporting • Where comprehensive reportingofallExploration
Results is not practicable, representative reporting
ofboth low andhighgrades and/orwidths should
be practiced to avoid misleading reporting of
Exploration Results.
• This is an update with no assay results reported.
Other substantive
exploration data
• Other explorationdata, ifmeaningfulandmaterial,
should be reportedincluding (but not limited to):
geological observations; geophysical survey
results; geochemicalsurvey results; bulk samples –
size and method oftreatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• Refer to previous releases of the first drill program
reported 7 May 2025 and earlier releases.
• All material data available is reported.
• No metallurgical testing, bulk density, or rock
characteristics have been undertaken
Further work • The nature and scale ofplanned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearlyhighlighting the areas ofpossible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
• Mineralisation minedhistoricallyis openalongstrike to
the NW and down-dip / plunge.
• The Company intends to conduct down hole
geophysical surveys to test the mainhistoric workings
and further targets in the area.
• Further work will include mineralogy, metallurgical
testwork and study work subject to satisfactory drill
results.
Share your feedback
Discover