ASX Announcement
23 January 2024
ASX: OD6
Quarterly Activities and Cashflow Report
OD6 Metals Limited (OD6 or the Company) is pleased to present its Quarterly
Activities and Cashflow Report for the period ending 31 December 2023
Highlights (including subsequent events):
ā¢
Standout Grades continued to be returned for Phase 3 drilling at Splinter Rock
ā
Extensive clay thicknesses up to 77m at high grades.
ā
77% of holes returned grades >1,000ppm TREO.
ā
Clay REE confirmed across a 14km by 5km zone at Centre Prospect.
ā
A thick high grade clay channel identified extensional to the southern end of the resource of
approximately 2km by 1km and up to 69m thick, with grades of 1,400ppm to 2,200ppm TREO.
ā¢
Real and substantial potential for Mineral Resource expansion based on these initial results.
ā¢
Metallurgical test results confirm low hydrochloric acid (HCl) consumption
ā
Average 16 kg HCl/t ore with multiple zones at 6-10 kg HCl/t ore
ā
Impressive leach and recovery responses observed at reduced acid strengths
ā
Average 61% MagREO recovery (range 43-87%) at 20g/l HCl
ā
The positive acid consumptions and recoveries when combined with high grades, low
stripping ratios, and substantial tonnages provide considerable confidence in the key
economic drivers
ā¢
Australiaās national science agency, CSIRO, applied machine-learning technology and advanced 3D
modelling to provide an enhanced interpretation of OD6ās Tempest AEM data
ā
The modelling compares well to existing drilling, allowing it to be trained on locally verified data
to produce predictions of:
ā
āŖ
thickness of surface cover, upper clay sediment zone and lower saprolite zone.
āŖ
maps of granite outcrops and depths of clay basin floors
āŖ
targets with the thinnest cover (for low stripping ratio)
āŖ
prioritised target areas based on multi-factor inputs for on-going exploration work.
Newly identified Prospects and expanded basin areas include:
āŖ
Untested northeast Splinter Rock tenements designated Tighthead, and Loosehead
prospects covering over 135 km2 at >40 metres expected clay thickness
āŖ
Expanded Centre Prospect basin area, increasing from 136 km2 to 154 km2 at > 40 metres
clay thickness with large zones of 60 to >80-metre-thick clays
ā¢
Annual General Meeting (AGM) held on 23 November 2023.
ā¢
Research and Development Tax Offset Funds of $962,697 received for FY23.
ā¢
Cash balance at the end of the December quarter remains strong at A$2.1M.
1
Brett Hazelden, Managing Director, commented:
āDelivered outcomes from exploration and advancement activities continue to meet and exceed our technical
expectations. During the last quarter we reported the best grades, extents and thicknesses that an Australian clay
hosted rare earths project has seen to date. This was complemented by continued strong metallurgical recoveries
with low acid consumptions and an expansion of our clay basin areas, delivered in partnership with ANSTO and
CSIRO.
The Inside Centre Prospect has emerged as a standout REE clay basin area, significantly exceeding our expectations
in the factors we believe drive an economically viable project. The Prospect will contribute significantly to an
expected expansion of our current Mineral Resource Estimate, which is already the largest and highest grade in
Australia and will see OD6 being potentially compared to some of the existing and future producers in China, South
America and Africa.
OD6 has emerged as Australiaās premier clay hosted rare earth company and is continuing to grow its resources,
de-risk the metallurgical process, help westernise the supply chain and take advantage of the forecast demand
surge. With the market yet to recognise the significant real and future potential value of the Company, there is an
excellent opportunity for savvy investors to take full advantage.
We continue to prudently manage expenditures, with our treasury position remaining strong with over $2M in the
bank at the end of the year, with current expenditure focused on metallurgical test work, research and development,
and preparation works for the next round of drilling.ā
For full details on the Mineral Resource Estimate, refer to ASX release dated 18 July 2023. OD6 confirms that it is not aware of any new
information or data that materially affects the information included in those releases. All material assumptions and technical parameters
underpinning those releases continues to apply and has not materially changed.
Exploration and Development (including subsequent events)
High Grade
OD6 reported final assay results for Phase 3 drilling at Splinter Rock that detailed standout
Phase 3 Drill
grades, thickness and extent of mineralisation at the Centre Prospect (refer ASX release, 9
results at Prop
November 2023). Highlights included:
Prospect
ā¢
Grades of up to 6,441 ppm Total Rare Earth Oxides (TREO) returned.
ā¢
Extensive clay thicknesses up to 77m at high grades.
ā¢
77% of holes returned grades >1,000ppm TREO
ā¢
Clay REE confirmed across a 14km by 5km zone at Centre Prospect.
ā¢
A thick high grade clay channel identified extensional to the southern end of the
resource of approximately 2km by 1km and up to 69m thick, with grades of
1,400ppm to 2,200ppm TREO.
ā¢
High value Magnet Rare Earth Oxides (MREO) represent an impressive average
of ~23% of TREO
ā¢
Real and substantial potential for Mineral Resource expansion based on these
results.
ā¢
All assays using 4-acid soluble digestion (i.e. does not fusion assay for resistate
non-acid soluble REE minerals)
ā¢
The Phase 3 drill program received funding through the Western Australian
Governmentās Exploration Incentive Scheme Co-funded drilling program.
2
Significant high-grade clay-hosted rare earth intersections include (@>300ppm cutoff)
ā¢
58 metres at 2,060ppm TREO (21.8% MREO) from 21 metres (SRAC0356)
ā¢
77 metres at 1,429ppm TREO (22.5% MREO) from 18 metres (SRAC0357)
ā¢
69 metres at 1,457ppm TREO (25.6% MREO) from 15 metres (SRAC0358)
ā¢
66 metres at 1,519ppm TREO (21.0% MREO) from 21 metres (SRAC0359)
ā¢
52 metres at 1,467ppm TREO (29.6% MREO) from 21 metres (SRAC0333)
ā¢
42 metres at 1,609ppm TREO (21.4% MREO) from 18 metres (SRAC0470)
ā¢
41 metres at 1,611ppm TREO (26.4% MREO) from 6 metres (SRAC0298)
ā¢
43 metres at 1,425ppm TREO (23.4% MREO) from 12 metres (SRAC0300)
ā¢
24 metres at 2,379ppm TREO (25.5% MREO) from 18 metres (SRAC0303)
ā¢
30 metres at 1,806ppm TREO (27.5% MREO) from 42 metres (SRAC0321)
ā¢
34 meters at 1,465ppm TREO (23.2% MREO) from 36 metres (SRAC0469)
ā¢
43 meters at 1,425ppm TREO (21.8% MREO) from 12 metres (SRAC0300)
ā¢
31 meters at 1,339ppm TREO (22.6% MREO) from 21 metres (SRAC0328)
ā¢
30 meters at 1,309ppm TREO (22.5% MREO) from 21 metres (SRAC0351)
ā¢
24 meters at 1,810ppm TREO (21.5% MREO) from 48 metres (SRAC0340)
ā¢
21 meters at 1,672ppm TREO (24.0% MREO) from 15 metres (SRAC0297)
Figure 1: Splinter Rock Project, Centre Prospect Drilling Results. Showing max down hole assay, overlaid on the AEM Mid time
electromagnetic conductivity model. Orange and red areas are interpreted to indicate thicker clay zones, with blue, green and
yellow areas the granites. Refer to ASX Announcement, 15 December 2022).
3
Figure 2: 3D view towards North. Drill locations with intercepts >1000ppm TREO. The 3D rendering shows base of modelled
saprolite clay basin.
Of particular note is a deep clay channel extensional to the southern end of the resource āInside
Centreā which is approximately 2,000m wide, 1,000m in length and up to 69m thick at grades of in
excess of 1,400 ppm TREO (refer Figures 3 and 4)
Figure 3: Splinter Rock Project, Inside Centre Prospect Drilling Results showing max down hole assay, overlaid on the AEM Mid time
electromagnetic conductivity model.
4
Figure 4: 3D view towards North zoomed into the Inside Centre zone. Drill locations with intercepts >1000ppm TREO of the Inside
Centre Zone. The 3D rendering shows base of modelled saprolite clay basins.
Metallurgical
During the quarter, OD6 reported metallurgical test results conducted by the Australian
Tests Confirm
Nuclear Science Organisation (ANSTO) (refer ASX release, 7 November 2023) which included
Low Acid
the following key outcomes:
Consumption
ā¢
Confirmed low hydrochloric acid (HCl) consumption
ā¢
Average 16 kg HCl/t ore with multiple zones at 6-10 kg HCl/t ore
ā¢
Impressive leach and recovery responses observed at reduced acid strengths
ā¢
Average 61% MagREO recovery (range 43-87%) at 20g/l HCl
ā¢
The positive acid consumptions and recoveries when combined with high
grades, low stripping ratios, and substantial tonnages provide considerable
confidence in the key economic drivers
ā¢
Vendor discussions confirm viability of potential site-based chlor-alkali (acid)
facility
ā¢
Indicative pricing for a chlor-alkali electrolyser is approximately £3M each (A$5.7M)
ā¢
Chlor-alkali plant also provides a sodium hydroxide (NaOH) product which is utilised
in impurity removal and precipitation of a final Mixed Rare Earth Product (MREC/H)
ā¢
A single chlor-alkali electrolyser has the potential to produce 62ktpa HCl and 69ktpa
of NaOH which, at an average consumption of 16 kg HCl / tonne of ore, is sufficient
to treat ~4Mtpa of REE bearing clay
Further metallurgical processing optimisation work underway. Importantly, all head-assays
contained in this ASX announcement are based on the 4-Acid soluble digestion method,
which aligns with the reporting of geological drill assays and the Mineral Resource Estimate.
Ten samples were leached at 10, 15 and 20 g/L HCl for 24 h at 30ļ°C (4 wt% solids), and results
were then compared to Phase 1 tests at 25 and 100 g/L HCl for 6 h at 30ļ°C (2 wt% solids).
5
The results indicate that:
ā¢
Extractions at 15 to 20 g/L HCl appear to be a balance point on recovery, acid strength
and acid consumption.
ā¢
Each prospect and mineralisation type has slightly different optimal acid conditions
ā¢
There is a notable outlier in Sample SR149A which has both high recovery and high
acid consumption.
ā¢
Neodymium (Nd), Praseodymium (Pr), Terbium (Tb) and Dysprosium (Dy) have very
similar recoveries for each test which is reflected in overall Magnetic Rare Earth
(MagRE) Percent Recovery
Summary of results by Prospect at 20g/L HCl:
ā¢
Flanker ā Acid consumption is 6 kg/t with a 65% MagRE Recovery.
ā¢
Centre ā Acid consumption ranging from 6 - 41 kg/t with a 43 - 56% MagRE Recovery.
ā¢
Scrum ā Acid consumption is 19 kg/t with a 55% MagRE Recovery.
ā¢
Prop ā Acid consumption ranging from 6 - 63 kg/t with a 49 - 87% MagRE Recovery.
Average overall acid consumption was 16 kg/t (excl. SR149A which had high acid use most
likely due to high surficial carbonates) with a 61% MagRE Recovery at 20g/l HCl
For completeness OD6 undertook sulfuric acid leach tests on four samples from the Phase 1
program utilising 25 and 50 g/L H2SO4 with a residence time of 24 h at 30 ļ°C (4 wt% solids).
The higher acid strength (50 g/L H2SO4) resulted in increased RE extractions in 3 of the 4
samples. The 50 g/L H2SO4 test showed MagRE recoveries comparable to that obtained in 25
g/L HCl in only 6 hours. However, the H2SO4 leach results had increased gangue
concentrations, and higher calculated acid consumptions.
Hydrochloric acid remains the preferred lixiviant, given that an increased sulphuric acid
strength and longer leach duration is required to achieve an equivalent extraction. Use of
sulphuric acid should not however be discounted at this stage of the metallurgical testing
program.
State of the Art
OD6 provided an update on CSIRO-led research and development outcomes at the Splinter
CSIRO
Rock Rare Earth Elements (REE) Project (refer ASX release, 15 November 2023), with
Modelling
highlights including:
Expands REE
Basins
ā¢
An expansion of clay basin areas at Splinter Rock delivered through new Airborne
Electromagnetic (AEM) modelling
ā¢
Australiaās national science agency, CSIRO, applied machine-learning technology
and advanced 3D modelling to provide an enhanced interpretation of OD6ās
Tempest AEM data
ā¢
The modelling compared well to existing drilling, allowing it to be trained on locally
verified data to produce predictions of:
ā
thickness of surface cover, upper clay sediment zone and lower saprolite
zone.
ā maps of granite outcrops and depths of clay basin floors.
ā
targets with the thinnest cover (for low stripping ratio).
6
ā
prioritised target areas based on multi-factor inputs for on-going
exploration work.
ā¢
Newly identified Prospects and expanded basin areas included:
ā¢
Untested northeast Splinter Rock tenements designated Tighthead, and
Loosehead prospects covering over 135 km2 at > 40 metres expected
clay thickness
ā¢
Expanded Centre Prospect basin area, increasing from 136 km2 to 154
km2 at > 40 metres clay thickness with large zones of 60 to >80-metrethick clays
ā¢
Better modelling of the āInside Centreā area where the Company reported its best
intersections to date with a zone >1000 x 2000 m and >60 m thick and grades
1400 ppm to >2000 ppm TREO (refer release dated 9 November 2023).
Figure 5 details the updated clay basin prospect areas, inclusive of modelled depth
and granite locations, with Figure 6 identifying depth of cover above the clay
horizons inclusive of outcropping granites.
Figure 5: CSIRO modelled depth of surface cover. Orange and red areas are interpreted to indicate thicker clay zones, with
blue and green areas the granites.
7
Figure 6: CSIRO modelled depth of surface cover. Brown areas are interpreted thicker sand dune, with yellow areas
sands/silts/clays and green areas outcropping granites.
Figure 7: CSIRO produced schematic of Splinter Rock Clay Basins.
8
Phase 2 ANSTO
Metallurgical
Tests
Commenced
Phase 2 metallurgical testing progressed at ANSTO during the quarter to:
ā¢
Develop further understanding of the leachability of rare earths under lower acid or
desorption conditions over a longer leach time frame
ā¢
Understand leach performance using saline water vs fresh water.
ā¢
Test leach performance of the coarse and fines fractions following screening at 75µm
ā¢
Develop a standard test procedure for the screening of a large number of test
samples for potential RE recovery
A new batch of 62 metallurgical samples were sent to ANSTO for initial acid leach tests.
These samples have been selected from a wide variety of different clays, locations and
depths to continue to build a geo-metallurgical understanding of recovery across the four
main prospects at Splinter Rock.
In addition, 71 additional metallurgical samples were also selected from the Phase 3 Splinter
Rock drilling program and sent to ANSTO for initial acid leach tests.
From Grass Patch, 10 metallurgical samples were sent to ANSTO for initial acid leach tests.
QA/QC reviews with ALS and ANSTO have results delayed due to a number of samples
needing to be re-assayed.
Mineralogy
Mineralogy characterisation and testing is currently being conducted in conjunction with
characterisation
CSIRO, ANSTO and Murdoch University. The REE and clay host mineralogy is important
for in depth understanding of why higher recoveries can be achieved in particular Prospect
areas.
Geometallurgy (GeoMet) refers to the practice of combining variables such as geology,
grade, volume, geochemistry, mineralogy and metallurgy to combine economic models with
exploration. The aim is to optimise the economics of a deposit to facilitate the identification
and ranking of preferred initial mining areas across clay hosted prospects. As Splinter
Rockās GeoMet relationships are systemically mapped, clay areas containing the highest
grades and metallurgical recoveries of rare earth elements can be identified and targeted for
advanced stage work streams.
Various mineralogy testing methods are being undertaken, which include quantitative XRD,
SEM/EDS and QEMSCAN. Determining the mineralogical composition of the high-grade
areas is key to designing an economically successful processing facility.
Heritage
Heritage Surveys were commenced for the proposed Phase 4 drilling program at Splinter
Surveys
Rock with the Ngadju Native Title Aboriginal Corporation. The new heritage surveys
Progressing at
included close spaced (200m) drill lines and further regional target reconnaissance.
Splinter Rock
Environmental
Spring environmental surveys have been completed at Splinter Rock to enable infill drilling
Surveys
and new drill tracks for regional drilling to be undertaken. This data is provided to the
Completed at
Department of Mines (DEMIRS) to assist in timely approvals for permits of work (PoW).
Splinter Rock
9
Corporate
R&D Tax Offset
OD6 submitted a R&D Tax Incentive claim for eligible Australian R&D activities at the
Splinter Rock and Grass Patch clay hosted rare earth projects, with $962,697 returned for
the 2023 Financial year. The Company expects to continue R&D works and anticipates being
able to claim future tax offsets over the coming years. OD6 is fully committed to R&D as it
continues to develop critical minerals technologies through relationships with the CSIRO,
Murdoch University, ANSTO, private research providers and internally.
Annual General
OD6 Metals held its Annual General Meeting (AGM) on 23 November 2023. All resolutions
Meeting
were passed. Please refer to the following announcements:
ESG Foundation
Initiatives
Continue
ā¢
Chairmans address and AGM Presentation (ASX release, 23 November 2023).
ā¢
Results of Meeting (ASX release, 23 November 2023).
ā¢
Notice of Meeting (ASX release, 13 October 2023).
ā¢
Updated Constitution (ASX release, 23 November 2023).
OD6 recognises that implementing environmental, social and governance (ESG) practices in
the resources sector plays an important role in generating long-term sustainable outcomes.
The Company was pleased to include an inaugural ESG section in its 2022/23 Annual Report
(refer ASX release, 6 September 2023).
ANU REE
Conference
OD6 presented at the Australian National Universityās Rare Earth Element Conference held in
Canberra. The conference was an opportunity to meet various participants in the Rare Earth
sector and also provide a technical presentation on the OD6 Splinter Rock Project (refer ASX
release, 16 November 2023).
Cash Holdings
The Company had A$2.1M million of cash on hand at 31 December 2023
Securities on
Issue
Fully Paid Ordinary Shares
102,450,745
Performance rights
OPTIONS
3,800,000
33,750,371
Fully paid ordinary shares include 47,435,249 shares escrowed until 22 June 2024
The 2,500,000 Performance Rights on issue are classified as restricted securities by the ASX
and are to be held in escrow until 22 June 2024.
During the quarter the Company issued 1,000,000 performance right and 1,900,000 options
to the Directors. Further 300,000 performance rights and 750,000 options to employees and
contractors
Options on issue comprise:
ā¢
22,050,371 Founder Options exercisable at A$0.30 on or before 31 October 2025.
ā¢
3,850,000 Incentive Options exercisable at A$0.30 on or before 31 March 2026.
ā¢
300,000 Contractor Options exercisable at A$0.30 on or before 13 April 2025.
ā¢
1,500,000 Performance Options exercisable at A$0.50 on or before 31 March 2026.
ā¢
2,500,000 Lead Manager Options exercisable at A$0.30 on or before 20 June 2025.
10
ā¢
900,000 Performance Options exercisable at A$0.30 on or before 09 October 2026
ā¢
2,650,000 Incentive Options exercisable at A$0.27 on or before 08 December 2026.
As at 31 December 2023 none of the performance milestones of the Performance Rights
had been met, nor had any shares been issued on conversion of Performance Rights.
A summary of the performance milestones is outlined below:
Borrowings
CLASS
NUMBER
MILESTONE
EXPIRY DATE
A
1,000,000
The Company announcing to ASX a JORC Code compliant
inferred (or greater) Mineral Resource (as defined in the
JORC Code) of not less than 250,000,000 tonnes (of which
at least 100,000,000 tonnes must be an indicated Mineral
Resource), grading a minimum of 800 ppm total rare earth
oxides (TREO).
22 June 2024
B
1,500,000
Upon completion of a scoping study on a Project (prepared
in accordance with the guidelines prescribed by the JORC
Code and independently verified by an independent
competent person under the JORC Code) that
demonstrates an internal rate of return (IRR) of more than
20%.
22 June 2025
C
1,000,000
The Company announcing to ASX a JORC Code Compliant
inferred (or greater) Mineral Resource (as defined in the
JORC Code) of not less than 1,000,000,000 tonnes (of which
at least 400,000,000 tonnes must be an indicated Mineral
Resource), grading a minimum of 1000 ppm total rare earth
oxides (TREO).
08 December
2026
D
300,000
The rights vest on the Company announcing to ASX the
results of a Scoping Study (as defined in the JORC Code)
showing the potential to generate an internal rate of return
(IRR) of more than 20% using consensus prices and Board
approved assumptions.
08 December
2026
The Company has no borrowings
11
Expenditure
Comparison to
In accordance with Listing Rule 5.3.4, as the December 2023 quarter was in a period covered
IPO Prospectus
by a āUse of Fundsā statement in the IPO Prospectus, below is a comparison of the
Companyās actual expenditure to 31 December 2023 compared with the āUse of Fundsā
statement.
Use of Funds
EXPENDITURE ALLOCATED
ACTUAL EXPENDITURE TO DATE
UNDER PROSPECTUS -
30 September 2023
2 YEAR PERIOD (A$ā000)
(A$ā000)
Exploration on the Splinter Rock Project
5,802
3,810
Exploration on the Grass Patch Project
1,510
1,533
Expenses of the Offer
656
603
General working capital1
1,304
2,201
Totals
9,272
8,147
USE OF FUNDS UNDER PROSPECTUS
under
DATED 10 MAY 2022
Prospectus
1
Includes purchases of Property, Plant and Equipment
Exploration
Exploration and Evaluation expenditure during the quarter was A$570k. Expenditure
Expenditure
included assays, geophysics survey interpretation, site visits, heritage surveys, track
upgrades, ANSTO metallurgical testing, mineralogy, CSIRO research, tenements rental fees
and geological investigation
Related Party
During the quarter ended 31 December 2023, payments to related parties amounted to
Transactions
A$135k, comprising of Managing Director Fees, Non-Executive Director fees,
Superannuation and geological consulting fees to GeoSpy Pty Ltd, which is an entity
controlled by Darren Holden.
12
Mineral Interests
Exploration
Schedule of Exploration Licenses (E) held end of December 2023 Quarter
Tenements
PROJECT
TENEMENT
NUMBER
HOLDER
STATUS
GRANTED
OWNERSHIP
Splinter Rock
E 63/2115
Odette Six Pty Ltd
Granted
4 Feb 22
100%
Splinter Rock
E 69/3904
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3905
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3907
Odette Six Pty Ltd
Granted
14 Feb 22
100%
Splinter Rock
E 69/3893
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Splinter Rock
E 69/3894
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Grass Patch
E 63/2185
Grass Patch Metals Pty Ltd
Granted
1 Mar 22
100%
Grass Patch
E 63/2151
Grass Patch Metals Pty Ltd
Granted
2 Dec 21
100%
Grass Patch
E 63/2152
Grass Patch Metals Pty Ltd
Granted
3 Dec 21
100%
Grass Patch
E 63/2154
Grass Patch Metals Pty Ltd
Granted
6 Dec 21
100%
Grass Patch
E 63/2153
Grass Patch Metals Pty Ltd
Application
-
100%
Grass Patch
E 74/693
Grass Patch Metals Pty Ltd
Application
-
100%
Figure 8: OD6 Granted and Application exploration Licenses in the Esperance region of Western Australia
13
Quarterly ASX Announcements (including Subsequent Events)
This Quarterly Activities Report contains information extracted from ASX market announcements reported in accordance with the
2012 edition of the āAustralasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reservesā (2012 JORC
Code). Further details (including 2012 JORC Code reporting tables where applicable) of exploration results referred to in this
Quarterly Activities Report can be found in the following announcements lodged on the ASX:
08/12/2023 Notification regarding unquoted securities ā OD6
08/12/2023 Change of Directors Interest
23/11/2023 Constitution
23/11/2023 Results of Meeting
23/11/2023 Chairmans Address and AGM Presentation
20/11/2023 Research and Development Tax Offset Funs Received
16/11/2023 Investor Presentation ā ANU REE Conference
15/11/2023 Modelling Reveals Major Extensions to REE Basins
09/11/2023 Standout Grades and Thickness Confirmed at Centre Prospect
07/11/2023 Metallurgical Test Results Confirm Low Acid Consumption
These announcements are available for viewing on the Companyās website https://www.od6metals.com.au/. OD6 confirms that it is
not aware of any new information or data that materially affects the information included in any original ASX announcement.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted from the
Companyās ASX announcement dated 18 July 2023. OD6 confirms that it is not aware of any new information or data that materially
affects the information included in the original announcement and that all material assumptions and technical parameters
underpinning the Mineral Resource estimate continue to apply.
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to be forecasts,
forward looking statements, or statements about the future matters for the purposes of the Corporations Act or any other
applicable law. Statements regarding plans with respect to OD6 Metals projects are forward looking statements and can generally
be identified by the use of words such as āprojectā, āforeseeā, āplanā, āexpectā, āaimā, āintendā, āanticipateā, ābelieveā, āestimateā, āmayā,
āshouldā, āwillā or similar expressions. There can be no assurance that the OD6 Metals plans for its projects will proceed as expected
and there can be no assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6
Metals actual results, performance, or achievements to differ from those referred to in this document. While the information
contained in this document has been prepared in good faith, there can be given no assurance or guarantee that the occurrence of
these events referred to in the document will occur as contemplated. Accordingly, to the maximum extent permitted by law, OD6
Metals and any of its affiliates and their directors, officers, employees, agents and advisors disclaim any liability whether direct or
indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of
the information in this document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or
implied in any forward-looking statement; and do not make any representation or warranty, express or implied, as to the accuracy,
reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any
event or results expressed or implied in any forward-looking statement; and disclaim all responsibility and liability for these
forward-looking statements (including, without limitation, liability for negligence).
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which have been crossreferenced to previous market announcements made by the Company. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the relevant market announcements.
This announcement has been authorised for release by the Board of OD6 Metals Ltd
14
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration
and development opportunities within the critical mineral
sector. The Company has successfully identified clay hosted rare
earths at its 100% owned Splinter Rock and Grass Patch Projects,
which are located in the Esperance-Goldfields region of Western
Australia - about 30 to 150km northeast of the major port and
town of Esperance.
Drilling and geological analysis at its flagship Splinter Rock has
shown widespread, thick, high-grade clay hosted REE deposits that
extend over hundreds of square kilometres. Metallurgical testing
using hydrochloric acid to leach the rare earths have resulted in
positive REE recoveries with optimisation ongoing.
The Company aims to delineate and define economic resources
and reserves of Rare Earth Elements (REE), in particular Neodymium (Nd), Praseodymium (Pr), Dysprosium (Dy) and Terbium
(Tb), which can be developed into a future revenue generating mine. Clay REE deposits are currently economically extracted
in China, which is the dominant world producer of REEs.
REE are becoming increasingly important in the global economy, with uses including advanced electronics and permanent
magnets in electric motors. As an example, a neodymium magnet used in a wind turbine or electric vehicle motor is 18
times stronger than a standard ferrite magnet significantly increasing energy use efficiency.
As part of the exploration process the Company has entered into heritage agreements with Esperance Tjaltrjraak Native Title
Aboriginal Corporation and the Ngadju Native Title Aboriginal Corporation that serves to both enable exploration and protect
important cultural sites on Country.
Corporate Directory
Managing Director
Mr Brett Hazelden
Non-Executive Chairman
Dr Darren Holden
Non-Executive Director
Mr Piers Lewis
Non-Executive Director
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Mr Troy Cavanagh
Joint Company Secretary
Mr Joel Ives
Exploration Manager
Tim Jones
Contact