Investor Presentation - Ignite Investment Summit
Released
Released
Announcement PDF
15-16 October 2025 | Ignite Investment Summit ASX:OD6
OD6 Metals
Australian Rare Earths and Copper
Splinter Rock Rare Earth Project Leveraging the Rising Tide for REE’s
Gulf Creek Drilling Commencing to Follow up High-Grade Copper in Massive Sulphides
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
Disclaimer
This presentation has been prepared by OD6 Metals Ltd (ACN 654 839 602) (OD6) and is current as at the date
of this document. The information contained in this presentation is for informational purposes only and does
not constitute an offer to issue, or arrange to issue, securities or other financial products. The information
contained in this presentation is not investment or financial product advice and is not intended to be used as
the basis for making an investment decision. The presentation has been prepared without considering the
investment objectives, financial situation or needs of any particular person. Before making an investment
decision, you should consider, with or without the assistance of a financial adviser, whether an investment is
appropriate considering your particular investment needs, objectives and financial circumstances. Past
performance is no guarantee of future performance. Any securities that may be issued by OD6 should be
considered speculative and there is no guarantee implied or explicit that there will be a return on the capital
invested or that any dividend will be paid or that there will be an increase in the price or value of OD6’s shares
in the future.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this presentation. To the maximum
extent permitted by law, none of OD6, its directors, employees or agents, nor any other person accepts any
liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from
the use of the information contained in this presentation. In particular, no representation or warranty,
express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or
reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to
significant uncertainties and contingencies.
No New Information
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is
extracted from the Company’s ASX announcement dated 29 May 2024. OD6 confirms that it is not aware of
any new information or data that materially affects the information included in the original announcement
and that all material assumptions and technical parameters underpinning the Mineral Resource estimate
continue to apply.
This document contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves” (2012 JORC Code) and available for viewing at https://www.od6metals.com.au/investors/asx-
announcements/. OD6 confirms that it is not aware of any new information or data that materially affects the
information included in any original ASX market announcement.
Forward Looking Statements
Certain statements contained in this presentation, including information as to the future financial or
operating performance of OD6 and its projects, are forward looking statements. Such forward looking
statements:
• may include, among other things, statements regarding incomplete and uncertain proposals or
targets, production and prices, operating costs and results, capital expenditures, and are or may be
based on assumptions and estimates related to future technical, economic, market, political, social
and other conditions;
• are necessarily based upon several estimates and assumptions that, while considered reasonable by
OD6, are inherently subject to significant technical, business, economic, competitive, political and
social uncertainties and contingencies; and
• involve known and unknown risks and uncertainties that could cause actual events or results to differ
materially from estimated or anticipated events or results reflected in such forward-looking
statements.
OD6 disclaims any intent or obligation to update publicly any forward-looking statements, whether as a
result of new information, future events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking
statements made in this presentation are qualified by the foregoing cautionary statements. Recipients are
cautioned that forward looking statements are not guarantees of future performance and accordingly
investors are cautioned not to put undue reliance on forward looking statements due to the inherent
uncertainty therein.
No representation is made that, in relation to the tenements the subject of this presentation, OD6 has now
or will at any time in the future develop further resources or reserves within the meaning of the Australian
Code for Reporting of Exploration Results, Mineral resources and Ore Reserves (The JORC Code).
Cautionary Statement
In relation to photographs of mine-spoil material, from Gulf Creek no representation as to the composition
of the rocks is presented here. Laboratory assay results are required to determine the grade of
mineralisation and the Company will update the market when check sampling and assay results are
received and compiled. The Competent Person advises that the photographs contained in this Presentation
are not necessarily representative of the geology exploited by historic mines at Gulf Creek and are not to be
construed as being representative of potentially economic mineralisation.
2
IMPORTANT INFORMATION
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 3
Two Australian Critical Minerals Projects Presents Significant Share Price Upside
INVESTMENT HIGHLIGHTS
• Strong Rare Earth and Copper Demand Fundamentals
• Splinter Rock Rare Earths Project 1
o 682Mt at 1,338 ppm TREO JORC Resource
o Outstanding Metallurgical Results to Lower CAPEX
o Premium MREC and MREH with High Payability
o Offtake Engagement - America, Europe & Asia
o Positive Study Outcomes - ANSTO and CPC
o Accelerated Scale up Testing at ANSTO
• Gulf Creek Copper Project 2
o Copper up to 4.6% Confirmed in Phase 1 Drilling
o High Grade Production History (Up to 12% Cu)
o Multiple High Priority, Untested Targets
o 7-hole, ~1,750m Drill Program to Commence October 1. Refer to ASX Announcement High Quality MREC produced
2. Refer to ASX Announcement High Grade Copper Massive Sulphides
ASX:OD6
Splinter Rock
Rare Earth
Tenements REE Clay Basins
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
hydrogen helium
1 2
H He
lithium beryllium boron carbon nitrogen oxygen fluorine neon
3 4 5 6 7 8 9 10
Li Be B C N O F Ne
sodium magnesium aluminium silicon phosphorus sulfur chlorine argon
11 12 13 14 15 16 17 18
Na Mg Al Si P S Cl Ar
potassium calcium scandium titanium vanadium chromium manganese iron cobalt nickel copper zinc gallium germanium arsenic selenium bromine krypton
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
K Ca Sc Ti V Cr Mn Fe Co Ni Cu Zn Ga Ge As Se Br Kr
rubidium strontium yttrium zirconium niobium molybdenum technetium ruthenium rhodium palladium silver cadmium indium tin antimony tellerium iodine xenon
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
Rb Sr Y Zr Nb Mo Tc Ru Rh Pd Ag Cd In Sn Sb Te I Xe
cesium barium hafnium tantalum tungsten rhenium osmium iridium platinum gold mercury thallium lead bismuth polonium astatine radon
55 56 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86
Cs Ba Hf Ta W Re Os Ir Pt Au Hg Tl Pb Bi Po At Rn
francium radium rutherfordium dubnium seaborgium bohrium hassium meiterium darmstadtium roentgenium copernicium nihonium flerovium moscovium livermorium tennessine oganesson
87 88 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118
Fr Ra Rf Db Sg Bh Hs Mt Ds Rg Cn Nh Fl Mc Lv Ts Og
lanthanum cerium praseodymium neodymium promethium samarium europium gadolinium terbium dysprosium holmium erbium thulium ytterbium lutetium
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71
La Ce Pr Nd Pm Sm Eu Gd Tb Dy Ho Er Tm Yb Lu
actinium thorium protactinium uranium neptunium plutonium americium curium berkelium californium einsteinium fermium mendelevium nobelium lawrencium
89 90 91 92 93 94 95 96 97 98 99 100 101 102 103
Ac Th Pa U Np Pu AmCm Bk Cf Es Fm Md No Lr
5
Four Critical, High Value Metals, Which Captures 90% of the MREC Product Value
CRITICAL MAGNET RARE EARTH ELEMENTS
Pr
Praseodymium
59
Nd
Neodymium
60
Dy
Dysprosium
66
Tb
Terbium
65
• Electric vehicles
• Wind turbines
• Electric vehicles
• Wind turbines
• Semiconductors
• Electric vehicles
• Wind turbines
• Nuclear reactors
• Semiconductors
• Xray's
• High temp fuel cells
• Electric vehicles
• Wind turbines
• Semiconductors
Light rare earth elements Heavy rare earth elements
Light rare earth elements
Heavy rare earth elements
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 6
Inside Centre to be the Cornerstone Deposit at Splinter Rock
1. Refer to ASX Announcement Mineral Resource Estimate Doubles
2. Refer to ASX Announcement IXI Improves Processing Flowsheet
3. Refer to ASX Announcement High Quality MREC produced
GLOBALLY SIGNIFICANT CLAY-HOSTED RARE EARTH DISCOVERY
• 682Mt at 1,338 ppm TREO (at a 1,000ppm cut-off grade)
for 910 kt contained TREO 1
• High-value MagREO represents an average of ~23% of
TREO grade for 205 kt contained MagREO 1
• High Grade Inside Centre Prospect 119Mt at 1,632ppm
TREO (Indicated)
• Overall Process Recoveries of ~75% 2
• High-quality MREC ~56% & MREH ~59% TREO 3
• +90% of product value from Nd + Pr + Dy +Tb
• Located close to port of Esperance away from farmland
• No private royalties
MagREO (Magnet Rare Earth Oxide) = Nd2O3 + Pr6O11 + Tb4O7 + Dy2O3
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 7
Upside to Towards Billions of Tonnes – Across a Tenement Holding Area of 949 km2
RESOURCE GROWTH POTENTIAL
• Current resource based on drilling <10% of
clay basins identified
• Inside Centre has direct extensions of thick
REE high-grade zones pending extensional
drilling
• Centre Basin Extends >30km to the NE to
Tighthead
• Potential to exceed well beyond 1 billion
tonnes
• Has the best zone even been discovered ?
1. Refer to ASX Announcement Mineral Resource Estimate Doubles
2. Refer to ASX Announcement Start of the Art Modelling Reveals Basin Extensions
Inside Centre
Indicated Resource
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 8
Indicated MRE OF 119Mt at 1,632ppm TREO (at 1,000ppm TREO cutoff grade)
INSIDE CENTRE - A HIGH GRADE STAND OUT
Inside Centre to be the focus of future works
Refer to ASX Announcement Mineral Resource Estimate Doubles
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 9
Rare Earths Recovered with Simple Heap Leach
OUTSTANDING METALLURGICAL RESULTS
• Simple acidic heap leach
• Capital intensive processing
steps removed - tanks,
thickening, clay washing, solid
liquid separation
• Excellent overall Nd and Pr
recovery of ~75% inclusive of
impurity removal
• 84.5% of HCl recycled using
Nanofiltration = 7.5 kg HCl/t ore
consumption
1. Refer to ASX Announcement Heap Leach Improves Met Recoveries
2. Refer to ASX Announcement IXI Improves Processing Flowsheet
3. Refer to ASX Announcement High Quality MREC produced
4. Refer to ASX Announcement Innovative Process Flowsheet Selected with High Recoveries
0
10
20
30
40
50
60
70
80
La Ce Pr Nd Sm Eu Gd Tb Dy Ho Er Tm Yb Lu Y TREY
Total
REE
%
Recovery
Inside Centre Deposit - Extraction by REE
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 10
Simplified Processing Pathway to Produce High Quality Low Impurity Product
INNOVATIVE PROCESSING STEPS
1. Refer to ASX Announcement Innovative Process Flowsheet Selected with High Recoveries
2. Refer to ASX Announcement Nanofiltration Reduces Acid Requirements By Over 80%
• 84.5% Acid Recycling with
Nanofiltration (NF)
• 69% reduction in liquor volume
sent to Ion Exchange (IX) and
Impurity Removal (IR) Circuits
• High quality MREC and MREH
~56-59% TREO and Low Impurity
(Al, Fe, Si, U, Th)
• Product quality meets or
exceeds global MREC and MREH
benchmarks
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 11
Existing Australian Infrastructure a Key Differentiating Factor
PRIME LOCATION FOR FUTURE DEVELOPMENT
ESTABLISHED
ESPERANCE TOWNSHIP
• Proximate to large
coastal town
Esperance.
• Local workforce
potential for any
future development
READY ACCESS TO
ESPERANCE BULK PORT
• Esperance Port handles
over 200 ships p.a.
• Cape size vessel
capacity
• Regular container ships
link to the export
market
SERVICED BY EXISTING
ROAD NETWORK
• Established, well
maintained road
network connecting
Splinter Rock to town
and port
LOCAL RENEWABLE
POWER CONNECTED
• Proven renewable
energy production
• Esperance has Dual
4.5 MW wind turbines
plus 4 MW solar farm
and gas turbines
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
12
BENCHMARKING SHOWS POTENTIAL LOW CAPEX PROJECT
OD6 IXR MEI VMM VTM BCM LIN ILU ARU
Location Australia Uganda Brazil Brazil Australia Brazil Malawi Australia Australia
Ore Type Clay Hosted Clay Hosted Clay Hosted Clay Hosted Clay Hosted Clay Hosted
Hard Rock
Monazite
Hard Rock
Monazite
Hard Rock
Apatite
Processing Method
Heap Leach
at Ambient
Heap Leach
at Ambient
Leach Tanks
at Ambient
Leach Tanks
at Ambient
Leach Tanks
at 60-90oC
In-situ Leach
Gravity, Mag
Sep & Float
Crack, Leach,
Purify, SX
Mill, Float,
Leach, Bake, SX
Product MREC/H MREC MREC MREC MREC MREC
Monazite
Conc.
Nd Pr Dy Tb
Oxides
NdPr Oxide +
SEG/HRE Oxide
Resource Grade TREO 1,338 ppm 640 ppm 2,359 ppm 2,508 ppm 493 ppm 746 ppm 2.14 % Mixed 2.6 %
Feed Grade TREO 1,632 ppm 848 ppm 3,701 ppm 3,380 ppm 520 ppm 1,113 ppm 2.9 % Mixed 2.9 %
Annual Throughput TBA 5 Mtpa 6 Mtpa 5 Mtpa 8 Mtpa 9 Mtpa 536 ktpa Variable 1.05 Mtpa
TREO Recovery ~70-75% 35 % 55 % 57 % 86 % # 48 % 60 % Not stated 80 - 85%
REO Production TBA 1,160 t 13,584 t 9,448 t
1,913 t
excludes Ce+La
4,800 t 8,259 t 15,100 t 5,013 t
Payability Assumed 70-75 % 70 % 70 % 70 % 85 % 70 % 50-60 % 100 % 70 - 100 %
CAPEX TBA US$120 M US$443 M US$354 M US$219 M US$55 M US$40 M ~US$1,200 M US$1,226 M
Capital Intensity
per tonne REO or NdPr
TBA US$104,803 US$32,611 US$37,468 US$114,479 US$11,458 US$4,843 US$79,470 US$244,564
Annual OPEX
$/kg REO or NdPr
TBA
US$52.99 /kg
REO
US$13,53 / kg
REO
US$9.30 / kg
REO
US$69.32 /kg
REO
US$6.15 / kg
REO
US$3.70 /kg
REO
US$37 / kg
NdPr
US$43.7 / kg
NdPr
Market Capitalisation1 ~$12 M ~$91 M ~$303 M ~$131 M ~$192 M ~$30 M ~$308 M ~$2.7 B ~$455 M
Link to Source
DFS Report
20 March 2023
PFS Report
21 July 2025
PFS Report
9 July 2025
Scoping Study
12 March 2025
Scoping Study
26 Feb 2025
FS Report
1 July 2024
Update Econ.
6 Dec 2024
Debt Funding
23 July 2024
12
# recovery post +53um
material removal
1. As at 26 August 2025
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 13
US Government determination to develop domestic critical minerals underpins REE industry revival
US Department of
Defense invests
US$400M in direct
equity in America’s
largest REE producer –
MP Materials, operator
of the Mountain Pass
mine in California
RARE EARTHS MARKET HEATING UP
The deal includes
offtake & minimum
price guarantees for
NdPr at a significant
premium to current
spot
Subsequently, Apple
have entered into a
US$500M
agreement to buy
rare earths magnets
from MP Materials
Chinese REE export
restrictions
intensifies US
Government efforts
to establish a
domestic REE
supply chain
ASX:OD6
Gulf Creek
Copper
Historic High-Grade Copper-Zinc Mine (1896-1912)
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 15
Perfectly Positioned For Project Development
GULF CREEK COPPER
• Tier 1 Location: Northern NSW, Australia
• Ideally located with road access to Port of Newcastle
• Situated between two renewable energy zones (REZ)
• 83km from the nearest gas pipeline and rail lines
GULF CREEK
COPPER
23.75 km2
Tenement
Area
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 16
MAIDEN DRILLING COMPLETE & PHASE 2 READY
• Successfully 6 hole maiden drill
program confirmed high-grade copper
o 8m @ 1.41% Cu, 1.26% Zn, 7.08g/t Ag
o 6m @ 1.32% Cu, 2.82% Zn, 9.02g/t Ag
o 1m @ 4.33% Cu, 1.02% Zn, 2.5g/t Ag
• Strong relationship between magnetism
and massive sulphide mineralisation
• Phase 2 drilling to test repeat
structures identified by magnetic
geophysics modelling
• Downhole EM and magnetics to further
identify follow up targets
Plan view of Phase 1 drilling
Exploration Targeting Methodology Confirmed
Refer to ASX Announcement High Grade Copper Massive Sulphides
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 17
GULF CREEK COPPER – HIGH GRADE VMS SYSTEM
Formation of a copper and zinc rich VMS System with magnetite association
Gulf Creek is a
Classic VMS
System
Formed on the
sea-floor when
hydrothermal
vents deposited
copper rich
sulphides
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
Very elevated grades (up to 4.6% Cu) within hole GC0004
GULF CREEK – HIGH-GRADE COPPER CONFIRMED
18
Chip Trays from Hole GC0004 showing the classic VMS stratigraphic succession from hanging wall
sediments, jaspilite, disseminate to semi-massive to massive sulphides to footwall basalts
Refer to ASX Announcement High Grade Copper Massive Sulphides
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
Magnetism Correlates with Copper in GCC004
MAGNETIC SUSCEPTIBILITY AND MINERALISATION
0
5
10
15
20
25
30
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260
Magnetic
Susceptibility
*10-3
SI
GCC004 Downhole Depth
Bobs Creek formation
Non-Magnetic sediments
Hanging wall
exhalative jaspilite
Non-magnetic
Mineralised zone –
strongly magnetic
either side of the
massive sulphides
Footwall basalts
moderately
magnetic
Footwall
sediments – low
magnetic
~ x 25 times increase in
magnetic susceptibility
due to hydrothermal
magnetite association in
mineralized zone
Top of footwall basalts
higher magnetic
susceptibility due to
hydrothermal magnetite
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 20
Multiple Extensional and Repeat Magnetic Targets Indicated by 3D Inversion Modelling1
VMS SYSTEMS KNOWN FOR REPEAT STRUCTURES
Long section1 zoomed out
• Geophysical modelling has identified
multiple, high priority and untested
targets 1
• 7 priority holes at Big Bend, NorthWest
and West Limb Targets ~1,750m
• Drilling to commence in late September
• Program can be expanded based on
success with 25-hole, ~7,500m permitted
• >3km of untested target magnetite-VMS
target horizon in immediate mine area
• Potential >10km across entire tenement
Refer to ASX Announcement High Grade Copper Massive Sulphides
OD6 METALS | AUSTRALIAN CRITICAL MINERALS
>10km Target Horizon including Historic Murchison Mine
SCALE POTENTIAL
Refer ASX Announcement New Potential VMS Copper Targets at Gulf Creek
21
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 22
High Calibre Leadership Team and Tight Capital Structure
CORPORATE SNAPSHOT
Mr Brett
Hazelden
MANAGING
DIRECTOR
Dr Darren
Holden
Geological Advisor
Mr Piers
Lewis
NON-EXECUTIVE
CHAIRMAN
Dr Mitch
Loan
NON-EXECUTIVE
DIRECTOR
Capital Structure ASX: OD6
Price per share 1 A$0.060
Total number of shares on issue 1 198.93M
Performance rights and options 2 86.87M
Market capitalisation (undiluted) 1 A$13.1M
Cash 2 A$3.0M
Debt 2 Nil
Enterprise value A$10.1M
Share Price 12 Month History A$/share Register Detail
1. As at 8 October 2025
2. Cash balance as at 1 October 2025
21%
8%
2%
69%
Founders (exc. Directors and Management)
Directors and Management
Family Offices and Institutions
Retail / Other
CONTACT US
LUCAS ROBINSON
Investor Relations
lucas@corporatestorytime.com
+61 408 228 889
23
REGISTERED OFFICE
c/o LCP Group
Level 1, 50 Kings Park Road
West Perth WA 6005
Phone: +61 8 6189 8515
Email: info@od6metals.com.au
SHARE REGISTRY
Computershare Investor Services
Level 11, 172 St Georges Tce
Perth WA 6000
www.od6metals.com.au
ASX:OD6
CONTACT US
OD6 METALS | AUSTRALIAN CRITICAL MINERALS 24
At 1,000ppm Cut Off Grade
SPLINTER ROCK MINERAL RESOURCE ESTIMATE
Prospect Category
Tonnes
(Mt)
TREO
(ppm)
Pr6O11
(ppm)
Nd2O3
(ppm)
Tb4O7
(ppm)
Dy2O3
(ppm)
MagREO
(ppm)
MagREO
(% of TREO)
Inside Centre Indicated 119 1,632 79 271 2 12 366 22.4%
Centre Inferred 276 1,342 65 228 3 15 310 23.1%
Centre NW Inferred 21 1,255 65 227 3 14 309 24.6%
Scrum Inferred 126 1,228 58 210 3 15 285 23.2%
Prop Inferred 94 1,160 53 190 2 13 259 22.3%
Flanker Inferred 45 1,250 59 212 3 16 290 23.2%
Total I+I 682 1,338 64 226 3 14 307 22.9%
GLOBALY
SIGNIFICANT
HIGH GRADE
CLAY HOSTED
MINERAL
RESOURCE
ESTIMATE (MRE)
TREO (Total Rare Earth Oxide) = La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Lu2O3 + Y2O3
MagREO (Magnet Rare Earth Oxide) = Nd2O3 + Pr6O11 + Tb4O7 + Dy2O3
% Magnet REO = (MagREO / TREO)*100
For full Mineral Resource estimate details refer to OD6 ASX announcement 29 May 2024, “Mineral Resource Estimate Doubles”. OD6 is not aware of any new information or data that materially affects the Mineral Resource estimate
included in that release. All material assumptions and technical parameters underpinning the Mineral Resource estimate in that release continue to apply and have not materially changed.
Refer to ASX Announcement Mineral Resource Estimate Doubles
Share your feedback
Discover