QUINN FLUORSPAR EXPLORATION UPDATE -
PHASE 1 COMPLETE, PHASE 2 UNDERWAY, ASSAYS PENDING
HIGHLIGHTS
PHASE 1 â SOIL AND STREAM SEDIMENT SAMPLING COMPLETE
⢠~320 soil samples collected across multiple targets as a base-line study
⢠~40 stream sediment samples collected for regional targeting
PHASE 2 â EXTENSIVE MAPPING AND SAMPLING NEARING COMPLETION
⢠Building on Phase 1 work, OD6 has expanded its program beyond initial targets and systematically
testing an 8km long alteration corridor
⢠Three geologists plus field support staff are on site
⢠Expanded channel sampling to be undertaken at the Horseshoe Pit and Mammoth deposit,
where the Company recently announced ultra-high grade fluorspar (CaF2) results
⢠Reconnaissance mapping and sampling at regional prospects including: Big Jim, Spar,
Jumbo, Rocket and North Horseshoe â historic high grade fluorspar occurrences
⢠Reconnaissance at the Horseshoe-Jumbo Corridor covering 1.1km strike length of alteration,
including a large 70,000m2
lithocap
⢠These programs are designed to refine the Companyâs geological model and will directly inform
the design of the initial drill program and associated permitting activities.
⢠Access track surveys ahead of drill planning
⢠Preliminary metallurgical test work to commence, assessing processing characteristics and support
future development studies
⢠Assays from Phase 1 pending â results expected to further define targets
⢠The company is well-funded to progress extensive exploration activities across the project
Managing Director Brett Hazelden, commented:
âAfter only 2 months since announcing the Quinn Fluorspar Project, the Company has already made significant on-
ground progress. The first pass soils and stream sediment sampling has been completed and we await assay results.
This work will be important in understanding the signatures of known deposits, and assist with targeting throughout
our large package.
With our recently reported ultra-high grade fluorspar results from preliminary due-diligence we are pleased to
getting back to conduct more mapping and sampling as part of Phase 2. This work, along with a survey of access
tracks, will enable better drill targeting and planning for the next programs.
Furthermore, we are collecting some samples for advancing the early-stage metallurgical understanding inclusive
of optical sorting, crushing, grinding and. preliminary flotation testwork.â
2
OD6 Metals Limited (OD6 or the Company) is excited to provide an update on on-ground
exploration at Quinn Fluorspar Project in Nevada. The initial Phase 1 exploration program has
now been completed, with all samples submitted for laboratory analysis. Assay results are
currently pending and will be released to the market as they are received and interpreted.
About Quinn Fluorspar Project
On 4 March 2026 the Company announced an exclusive option agreement to acquire the Quinn Fluorspar
Project, located approximately 220km north of Las Vegas, Nevada. The project offers very high-grade fluorspar
mineralization (>40% CaF2) identified at the Mammoth and Horseshoe Projects in replacement / breccia
style mineralization mapped out over large 9,000m2
and 3,000m2
areas respectively. In addition, a number
of other fluorspar occurrences are noted in the wider project area with reported historic rock chip results up to
94% CaF2. Preliminary work by the Company has revealed both Mammoth and Horseshoe to be very high grade
and potentially sizeable deposits.
The United States is currently 100% reliant on imports of fluorspar. Fluorspar is listed on the Critical Minerals
list with applications in battery technologies, AI chip manufacture, nuclear fuels industry, aerospace and
defence technologies. The project is located ~300km by road from the US Strategic Minerals Reserve at
Hawthorne, Nevada (refer to Company announcements 4/3/2026, 6/3/2026, & 16/03/2026).
Phase 1 Field Program Complete
OD6, through its wholly owned subsidiary US Fluorspar LLC, has teamed up with premier contract/consulting
company, Rangefront Mining Services, based out of Elko, Nevada to conduct the first concerted exploration
effort on the project in ~60 years.
The initial program is complete and included ~320 soil samples and 40 stream sediment samples, which have
been designed to develop knowledge on anomalism in and around the known deposits and to target key
alteration corridors for potential additional fluorspar discovery. Samples have been consigned the laboratory with
assay results pending. This work included Targeting:
1. The Horseshoe Deposit, where previous small scale mining exposed high grade (>40% CaF2) in a
replacement / breccia style ore body mapped out over 3000m2
.
2. Extensions of Mammoth Deposit, where previous sampling returned up to 10m @ 44.7%CaF2 and a
replacement / breccia style ore body mapped out over 9000m2
3. The Horseshoe-Jumbo corridor to follow up on the recently identified intense alteration corridor
system
4. The 70,000 m2
Lithocap with first ever exploration program to profile background anomalism potentially
bleeding through the lithocap
5. Targeting the area near high-grade vein occurrences at Rocket-Big Jim-Spar
6. Targeting the unexplored 700,000m2
Dress Circle target â a zone of highly altered limestone, with a
series of arcuate, possible collapse epithermal structures related to sub-surface source intrusive activity
3
Phase 2 Work Underway and Nearing Completion
Three geologists as well as field technicians have mobilized to the project area, with an additional geologist
joining the project shortly. The initial work is to focus on:
1. Channel sampling across all accessible fluorspar exposures at Horseshoe and Mammoth
2. Detailed geological mapping at Horseshoe and Mammoth
3. Conduct reconnaissance mapping and sampling at historic recorded fluorspar occurrences including:
Big Jim, Spar, Jumbo, Rocket and North Horseshoe.
4. Conduct mapping and sampling across the 1.1km Horseshoe-Jumbo Corridor covering 1.1km strike
length of alteration, including a large 70,000m2 lithocap
5. Survey access tracks for the first drill program
6. Collect metallurgical test samples for bench-top studies on optical sorting, crushing, grinding and.
preliminary flotation testwork
7. The Company continues to conduct due diligence, compile historic reports and compile data on this
exciting project area.
Due Diligence and Next Steps
As part of its due diligence program in connection with the Quinn Fluorspar Project (see announcement dated 4
March 2026, âOD6 TO ACQUIRE ULTRA HIGH GRADE USA FLUORSPAR PROJECTSâ), OD6 intends to collect new
samples from the surface showings to test the veracity of historic reports, including:
⢠Receipt and interpretation of assay results
⢠Expand systematic channel and rock chip sampling
⢠Validate and replicate historic high-grade results
⢠Undertake detailed geological and structural mapping
⢠Complete soil geochemistry programs
⢠Identify and prioritise drill targets
⢠Initiate permitting for maiden drilling
⢠Progress metallurgical testwork planning
4
Figure 1 Regional initial sampling programs over the target corridors
(refer release dated 25 March 2026 for description of geology, mineralization and alteration)
5
Figure 2 The Horseshoe-Jumbo alteration corridor programs
(refer release dated 25 March 2026 for description of geology, mineralization and alteration)
6
Figure 3 Quinn Fluorspar Location in Nevada.
7
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to
be forecasts, forward looking statements, or statements about the future matters for the purposes of the
Corporations Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects
are forward looking statements and can generally be identified by the use of words such as âprojectâ, âforeseeâ,
âplanâ, âexpectâ, âaimâ, âintendâ, âanticipateâ, âbelieveâ, âestimateâ, âmayâ, âshouldâ, âwillâ or similar expressions. There
can be no assurance that the OD6 Metals plans for its projects will proceed as expected and there can be no
assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6 Metals
actual results, performance, or achievements to differ from those referred to in this document. While the
information contained in this document has been prepared in good faith, there can be given no assurance or
guarantee that the occurrence of these events referred to in the document will occur as contemplated.
Accordingly, to the maximum extent permitted by law, OD6 Metals and any of its affiliates and their directors,
officers, employees, agents and advisors disclaim any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward-looking statement or any event or
results expressed or implied in any forward-looking statement; and do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this document, or
likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward-looking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence).
Competent Persons Statement
Information in this report relating to geological planning is based on information compiled by Dr Darren Holden
who is a Fellow of the Australasian Institute of Mining and Metallurgy.
Dr Holden is an employee of GeoSpy Pty Ltd and is a geological advisor to the Company and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the
Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Holden owns
shares in the Company and participates in the Companyâs employee securities incentive plan. Dr Holden
consents to the inclusion of the data in the form and context in which it appears.
This announcement has been authorised for release by the Board of OD6 Metals Limited
8
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration and development opportunities within the critical minerals
sector, namely rare earths, copper and fluorspar.
Rare Earth Elements
OD6 Metals has successfully identified clay hosted rare earths at its 100% owned Splinter Rock Project which is located in
the Esperance-Goldfields region of Western Australia.
The Company released a Mineral Resource Estimate (MRE) for Splinter Rock in May 2024, confirming that the project hosts
one of the largest and highest-grade clay-hosted rare earths deposits in Australia with an Indicated Resource of 119Mt @
1,632ppm TREO and an Inferred Resource of 563Mt @ 1,275ppm TREO with an overall ratio of ~23% high-value Magnetic
Rare Earths (MagREE).
An innovative Process Flow sheet has been selected utilising Heap Leaching, Nano-filtration and Ion Exchange Technologies
that have achieved ~75% Nd & Pr overall recovery, produced a high-quality Mixed Rare Earth Carbonate or Hydroxide
(MREC/H) of ~56-59% TREO, with low levels of impurities (Al, Fe, P, Si) and extremely low uranium and thorium content.
Fluorspar (Fluorite)
The Company secured an option to acquire the Quinn Fluorspar Project in Nevada, USA. Nevada is regarded as one of the
worldâs premier mining jurisdictions and is currently ranked second in the 2025 Fraser Instituteâs Mining Attractiveness Index.
Historically a number of the Quinn Fluorspar deposits were mined in the 1950âs for Fluorspar. In 1969. The United States
Geological Survey (USGS) conducted a survey and confirmed fluorspar grading up to 72% CaF2 in bulk samples.
The USA currently imports 100% of all Fluorspar consumed domestically with 68% of all global supply sourced from China
(USGS 2024). Fluorspar is listed as a Critical Mineral by the USGS and is essential in the production of hydrofluoric acid, AI
semi-conductor chip etching, advanced battery technologies and nuclear fuel processing with other applications in defence
and aerospace technologies.
Copper
The Company is advancing the Gulf Creek Copper-Zinc VMS Project located near the town of Barraba in NSW.
Gulf Creek was mined at around the turn of the 20th century and was once regarded as the highest-grade copper mine (2%
to 6.5% Cu) in NSW until its closure due to weak copper prices in 1912. Very little exploration has occurred at the project in
over 100 years, with OD6 aiming to apply modern day exploration technologies.
The 2025 maiden drilling program successfully defined high grade copper below the historical mine plus confirmed the
strong relationship between magnetism and massive sulphide mineralisation. Geophysical modelling has identified multiple,
high priority and targets ready for drilling providing over >3km of strike in the immediate mine-stratigraphy, and over
>10km across the tenement.
Corporate Directory
Managing Director
Non-Executive Chairman
Non-Executive Director
Financial Controller/ Joint Company Secretary
Joint Company Secretary
Technical Advisor to the Board
Contact
OD6 Metals Ltd
ACN 654 839 602
www.od6metals.com.au
Mail to: info@od6metals.com.au
Phone: +61 8 6189 8515
Level 1, 1 Alvan Street, Subiaco, WA 6008
Mr Brett Hazelden
Mr Piers Lewis
Dr Mitch Loan
Mr Troy Cavanagh
Mr Joel Ives
Dr Darren Holden
Investor Relations
Lucas Robinson
Corporate Storytime
lucas@corporatestorytime.com
Phone: +61 408 228 889
Share your feedback
Discover