Phase 3 Drilling Complete at Splinter Rock REE Project
Released
Released
Announcement PDF
ASX Announcement
15 August 2023
ASX: OD6
Phase 3 Drilling Complete
at Splinter Rock Critical Rare Earth Project
OD6 Metals Limited (OD6 or the Company) is pleased to advise that Phase 3
drilling is complete at its Splinter Rock Clay Hosted Rare Earth Project, located
northeast of Esperance in Western Australia.
Highlights:
•
Phase 3 Aircore (AC) drilling program complete at Splinter Rock
•
Total of 145 holes drilled for 7,435m at approximate average depth of 51m and maximum depth of 104m
•
Program designed to test the length extension and determine the grade continuity and thickness at key
Centre and Prop Prospect areas
•
The Phase 3 drilling has identified clays across a 16km length at Centre and 11km length at Prop
with widths between 4 to 5 km previously identified in Phase 1 and 2 drilling.
•
Observed clay thickness continues to correlate strongly with data obtained from previously completed
Airborne Electromagnetic Survey (AEM)
•
Assay results expected during Q3 2023
•
Strong potential for a Mineral Resource Estimate expansion and classification upgrade Q4 2023
Brett Hazelden, Managing Director, commented:
“This third phase of drilling at our flagship Splinter Rock Project program continues the advancement of our key
Centre and Prop Prospect areas. Our focus was to further test the significant length of these areas, whilst also
determining the continuity of grade and thickness of clay extensions. We are delighted to confirm clay thicknesses
initially observed, strongly correlate with, and validate, the Airborne Electromagnetic Survey data, providing our
team with further confidence in our exploration methodology.
OD6 is grateful for the continued support from the Department of Mines, Industry Regulation and Safety whose
funding, via the Exploration Incentive Scheme helped facilitate the expedition of this drill program.”
We eagerly await assay results and look forward to confirming our aim of significantly expanding on the length of
the main prospects and growing our clay hosted rare earths discovery even further.”
1
Infill drilling
continues to
confirm thick
clay horizons
Phase 3 AC drilling is complete at the Splinter Rock Critical Rare Earth Project. The program
was designed to test the localised consistency of clay type, thickness and grades at the Scrum,
Centre, Flanker and Prop Prospect areas (refer Figure 1). A total of 145-holes for 7,435m was
drilled at an approximate average depth of 51m and maximum depth of 104m at 400m
spacing interval.
The drill program continues to confirm thick saprolite clay horizons at our two largest prospect
areas (Prop and Centre), with samples currently being assayed for rare earth elements (REEs).
The Company is compiling and reviewing drill hole logs to enable detailed mapping of clay
depth and thickness. The phase 3 drilling has identified clays across a 16km length at Centre
and 11km length at prop with widths between 4 to 5 km previously identified in Phase 1 and
2 drilling campaigns.
Several planned holes were not completed as part of this drill program due to wet ground
conditions and will be revisited as part of a fourth phase of drilling.
Metallurgical samples will be selected for work at ANSTO once assays have been received.
The Phase 3 drill program received funding through the Western Australian Governments
Exploration Incentive Scheme Co-funded drilling program (refer ASX Announcement, 24 April
2023).
Figure 1: Splinter Rock Project completed drilling locations.
2
AEM continues Drilling targeted the two largest clay basin areas identified through the Airborne
to be highly
accurate
Electromagnetic Survey coloured yellow, red and pink in Figures 2 and 3, below (refer ASX
Announcement, 15 December 2022).
Drilling depths completed, and clay thicknesses observed strongly correlate with AEM data.
This enables OD6 to avoid areas of granites (blue areas in Figures 2 and 3, below) and/or
areas with minimal clays (green areas in the below) to focus drilling on the highly
prospective clay zones (orange, red and pink areas the below).
This approach minimises drilling and exploration expenditure, with drilling costs of
approximately A$35 per meter and total all in cost per meter including earthworks, heritage
surveys, assays, equipment, travel and other miscellaneous items totalling under A$100 per
meter.
Figure 2: AEM Mid time electromagnetic conductivity model of Scrum and Centre Prospects with infill drilling locations shown in red.
Yellow, red, pink areas interpreted to indicated thicker clay zones, with blue areas the granites).
3
Figure 3: AEM Mid time electromagnetic conductivity model of Flanker and Prop Prospects with infill drilling locations shown in red.
Yellow, red, pink areas interpreted to indicated thicker clay zones, with blue areas the granites).
Program
•
Phase 3 drilling assays are expected to be returned during Q3 2023
timeline
•
Final AEM data processing and 3D modelling expected to be completed during Q4 2023
•
Metallurgical testing and mineralogy assessments at ANSTO scheduled to be
progressively returned during Q3 and Q4 2023
•
Additional Hylogger analysis of the cross-sections of the Prop and Centre prospect to
further enhance understanding of drillcore mineralogy is expected to be returned from
CSIRO during Q4 2023
4
Visual Mineralisation Cautionary Statement
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are
required to determine the widths and grade of the visible mineralisation reported in preliminary geological
logging. The Company will update the market when laboratory analytical results become available. The reported
intersections are down hole measurements and are not necessarily true width. Descriptions of the mineral
amounts seen and logged in the core are qualitative, visual estimates only (they are listed in order of abundance
of estimated combined percentages). Quantitative assays will be completed by ALS Global in Perth Western
Australia
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
Competent Persons Statement
Information in this report relating to Exploration Results is based on information reviewed by Jeremy Peters,
who is a Fellow of the Australasian Institute of Mining and Metallurgy and a Chartered Professional Geologist
and Mining Engineer of that organisation. Mr Peters is an independent consultant of Burnt Shirt Pty Ltd and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the
Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Peters consents
to the inclusion of the data in the form and context in which it appears.
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to
be forecasts, forward looking statements, or statements about the future matters for the purposes of the
Corporations Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects
are forward looking statements and can generally be identified by the use of words such as ‘project’, ‘foresee’,
‘plan’, ‘expect’, ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. There
can be no assurance that the OD6 Metals plans for its projects will proceed as expected and there can be no
assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6 Metals
actual results, performance, or achievements to differ from those referred to in this document. While the
information contained in this document has been prepared in good faith, there can be given no assurance or
guarantee that the occurrence of these events referred to in the document will occur as contemplated.
Accordingly, to the maximum extent permitted by law, OD6 Metals and any of its affiliates and their directors,
officers, employees, agents and advisors disclaim any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward-looking statement or any event or
results expressed or implied in any forward-looking statement; and do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this document, or
likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward-looking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence).
This announcement has been authorised for release by the Board of OD6 Metals Limited
5
About OD6 Metals
OD6 Metals is an Australian public company pursuing
exploration and development opportunities within the critical
mineral sector. The Company has successfully identified clay
hosted rare earths at its 100% owned Splinter Rock and Grass
Patch Projects, which are located in the Esperance-Goldfields
region of Western Australia - about 30 to 150km northeast of
the major port and town of Esperance.
Drilling and geological analysis at its flagship Splinter Rock has
shown widespread, thick, high-grade clay hosted REE deposits
that extend over hundreds of square kilometres. Metallurgical
testing using hydrochloric acid to leach the rare earths have
resulted in positive REE recoveries with optimisation ongoing.
The Company aims to delineate and define economic resources
and reserves of Rare Earth Elements (REE), in particular Neodymium (Nd) and Praseodymium (Pr), which can be
developed into a future revenue generating mine. Clay REE deposits are currently economically extracted in China,
which is the dominant world producer of REEs.
REE are becoming increasingly important in the global economy, with uses including advanced electronics and
permanent magnets in electric motors. As an example, a neodymium magnet used in a wind turbine or electric
vehicle motor is 18 times stronger than a standard ferrite magnet significantly increasing energy use efficiency.
As part of the exploration process the Company has entered into heritage agreements with Esperance Tjaltrjraak Native
Title Aboriginal Corporation and the Ngadju Native Title Aboriginal Corporation that serves to both enable exploration and
protect important cultural sites on Country.
Corporate Directory
Managing Director
Mr Brett Hazelden
Non-Executive Chairman
Dr Darren Holden
Non-Executive Director
Mr Piers Lewis
Non-Executive Director
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Mr Troy Cavanagh
Joint Company Secretary
Mr Joel Ives
Exploration Manager
Tim Jones
Contact
OD6 Metals Ltd
ACN 654 839 602
www.od6metals.com.au
Mail to: info@od6metals.com.au
Phone: +61 8 6189 8515
Level 1, 50 Kings Park Road, West Perth, WA 6005
PO Box 277, North Beach, WA 6920
PO Box 2009, Esperance, WA 6450
6
Drilling Details (Third Phase – June to August 2023)
Hole ID
Type
Easting
Northing
RL
(m)
Azimuth
(degrees)
Dip
(degrees)
End of Hole
(m)
SRAC0280
SRAC0291
SRAC0292
SRAC0293
SRAC0294
SRAC0295
SRAC0296
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
498360
499186
498859
498532
498269
498077
497824
6343465
6338152
6337922
6337692
6337390
6337038
6336728
227
206
207
209
204
202
202
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
54.00
49.00
20.00
13.00
43.00
23.00
25.00
SRAC0297
SRAC0298
SRAC0299
SRAC0300
SRAC0301
SRAC0302
SRAC0303
SRAC0304
SRAC0306
SRAC0307
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
497503
497181
496786
496404
496028
497440
497223
497006
497873
498089
6336490
6336252
6336316
6336432
6336565
6334719
6334383
6334047
6335386
6335722
204
202
205
208
211
205
205
207
201
202
0
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
36.00
47.00
23.00
55.00
36.00
41.00
43.00
39.00
48.00
27.00
SRAC0308
SRAC0309
SRAC0310
SRAC0311
SRAC0312
SRAC0313
SRAC0314
SRAC0315
SRAC0316
SRAC0317
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
498313
498548
498814
499097
499346
499456
499566
499701
499906
500111
6336054
6336377
6336676
6336958
6337272
6337656
6338039
6338415
6338759
6339100
203
203
208
205
205
207
205
203
204
204
0
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
27.00
28.00
50.00
60.00
55.00
64.00
41.00
63.00
48.00
55.00
SRAC0318
SRAC0319
SRAC0320
SRAC0321
SRAC0322
SRAC0323
SRAC0324
SRAC0325
SRAC0326
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
500359
500676
501015
501389
501762
501811
501832
501855
501260
6339413
6339656
6339867
6340009
6340149
6340546
6340945
6341344
6341403
204
203
202
204
202
204
205
203
203
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
71.00
70.00
40.00
72.00
57.00
45.00
56.00
43.00
55.00
7
Hole ID
Type
Easting
Northing
RL
(m)
Azimuth
(degrees)
Dip
(degrees)
End of Hole
(m)
SRAC0327
SRAC0328
SRAC0329
SRAC0330
SRAC0331
SRAC0332
SRAC0333
SRAC0334
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
501763
501762
501759
501756
501754
502130
502529
502930
6341732
6342132
6342532
6342932
6343332
6343468
6343475
6343481
203
204
204
205
203
204
201
201
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
60.00
52.00
61.00
49.00
42.00
48.00
73.00
57.00
SRAC0335
SRAC0336
SRAC0337
SRAC0338
AirCore
AirCore
AirCore
AirCore
503329
503727
504100
504472
6343487
6343531
6343677
6343823
195
196
195
194
0
0
0
0
-90
-90
-90
-90
60.00
72.00
63.00
56.00
SRAC0339
SRAC0340
SRAC0341
SRAC0342
SRAC0343
SRAC0344
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
504861
505260
505386
505512
505639
505765
6343919
6344002
6344381
6344760
6345139
6345519
193
193
191
191
191
189
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
63.00
70.00
74.00
70.00
67.00
45.00
SRAC0345
SRAC0351
SRAC0352
SRAC0353
SRAC0354
SRAC0355
SRAC0356
SRAC0357
SRAC0358
SRAC0359
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
505890
500267
500567
500868
501167
501468
501767
502068
502177
501939
6345897
6338586
6338322
6338057
6337793
6337528
6337263
6336999
6336615
6336293
191
204
205
204
204
205
206
205
204
204
0
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
69.00
51.00
63.00
52.00
64.00
58.00
79.00
95.00
84.00
87.00
SRAC0360
SRAC0361
SRAC0362
SRAC0363
SRAC0364
SRAC0365
SRAC0366
SRAC0367
SRAC0368
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
515834
515633
515408
515202
515007
514813
516842
516618
516364
6323899
6324245
6324575
6324916
6325264
6325615
6325117
6325449
6325756
149
147
144
146
146
143
154
149
146
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
18.00
49.00
41.00
65.00
61.00
24.00
12.00
18.00
54.00
8
Hole ID
Type
Easting
Northing
RL
(m)
Azimuth
(degrees)
Dip
(degrees)
End of Hole
(m)
SRAC0369
SRAC0370
SRAC0371
SRAC0372
SRAC0373
SRAC0374
SRAC0375
SRAC0376
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
516139
515493
515666
515375
517557
517577
517650
518106
6326079
6327157
6326792
6327536
6325690
6326089
6326483
6327739
147
147
148
146
154
151
146
149
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
71.00
24.00
56.00
53.00
59.00
17.00
60.00
38.00
SRAC0377
SRAC0378
SRAC0379
SRAC0380
AirCore
AirCore
AirCore
AirCore
518227
518247
518251
512653
6328120
6328521
6328922
6325254
149
150
151
174
0
0
0
0
-90
-90
-90
-90
61.00
67.00
53.00
37.00
SRAC0381
SRAC0382
SRAC0383
SRAC0384
SRAC0385
SRAC0386
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
513053
513452
513852
514320
514718
515407
6325253
6325250
6325247
6325246
6325247
6325241
175
162
147
147
147
146
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
40.00
26.00
10.00
40.00
40.00
27.00
SRAC0387
SRAC0388
SRAC0389
SRAC0390
SRAC0391
SRAC0392
SRAC0393
SRAC0394
SRAC0395
SRAC0396
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
515806
516205
516607
517127
519528
519193
518890
518588
518048
517771
6325241
6325241
6325239
6325237
6327883
6328102
6328362
6328624
6329267
6329554
146
149
150
157
159
156
156
152
151
146
0
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
27.00
30.00
32.00
36.00
58.00
57.00
53.00
80.00
33.00
46.00
SRAC0397
SRAC0398
SRAC0399
SRAC0400
SRAC0401
SRAC0402
SRAC0403
SRAC0404
SRAC0405
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
517487
517215
516907
517655
516895
516495
516095
515694
515294
6329839
6330131
6330385
6329347
6329352
6329353
6329354
6329357
6329359
147
143
146
148
149
146
147
147
149
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
68.00
54.00
37.00
66.00
81.00
21.00
68.00
69.00
57.00
9
Hole ID
Type
Easting
Northing
RL
(m)
Azimuth
(degrees)
Dip
(degrees)
End of Hole
(m)
SRAC0406
SRAC0407
SRAC0408
SRAC0409
SRAC0410
SRAC0411
SRAC0412
SRAC0413
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
514893
514492
514091
516540
516577
516580
516574
516570
6329362
6329362
6329364
6329751
6330149
6330549
6330949
6331348
149
148
146
145
150
146
144
151
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
56.00
46.00
40.00
34.00
66.00
60.00
34.00
35.00
SRAC0414
SRAC0415
SRAC0416
SRAC0417
AirCore
AirCore
AirCore
AirCore
516553
516547
516542
523503
6332492
6332892
6333293
6331715
154
155
152
160
0
0
0
0
-90
-90
-90
-90
27.00
33.00
25.00
93.00
SRAC0418
SRAC0419
SRAC0420
SRAC0421
SRAC0422
SRAC0423
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
523214
522916
522632
522351
521882
521597
6331991
6332259
6332540
6332824
6333319
6333601
160
161
167
167
163
163
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
68.00
74.00
73.00
60.00
104.00
23.00
SRAC0424
SRAC0425
SRAC0426
SRAC0427
SRAC0428
SRAC0429
SRAC0430
SRAC0431
SRAC0432
SRAC0433
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
521223
520849
520488
520145
519774
518183
517803
517437
517069
516744
6333744
6333885
6334060
6334265
6334417
6335174
6335297
6335460
6335615
6335759
160
158
160
161
164
157
155
154
154
153
0
0
0
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
89.00
82.00
64.00
86.00
56.00
25.00
23.00
44.00
41.00
27.00
SRAC0439
SRAC0464
SRAC0465
SRAC0466
SRAC0467
SRAC0469
SRAC0470
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
AirCore
497687
515910
517779
517892
517964
501662
502305
6335034
6326443
6326787
6327096
6327444
6341390
6336788
202
146
142
143
144
203
203
0
0
0
0
0
0
0
-90
-90
-90
-90
-90
-90
-90
53.00
60.00
39.00
62.00
103.00
70.00
60.00
10
JORC 2012 – Table1: Splinter Rock
Section 1 Sampling Techniques and Data
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
•
•
•
•
Drilling techniques
Drill sample recovery
•
•
•
•
Logging
•
•
•
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Geochemical sampling was undertaken by
sampling of metre interval samples returned from
the cyclone of a conventional aircore drilling rig.
Certified reference samples, duplicates and blank
samples were inserted into the sample stream
such as to represent approximately 5% of the
samples submitted to the laboratory for analysis
Two composite samples were collected over three
metre intervals – the first (the A sample) being
submitted for laboratory analysis and the second
(the B sample) being retained as a reference.
A sample from each metre was collected and
stored in a chip tray for logging and x-ray
diffraction analysis
Air core drilling was completed by hammer and
blade industry standard drilling techniques
Aircore is considered to be an appropriate drilling
technique for saprolite clay
Drilling used blade bits of 87mmØ with 3m length
drill rods to blade refusal.
Air core recoveries were not recorded but are not
considered to be materially biased, given the
nature of the geology and samples.
The assay data will be analysed against control
samples and historical assays for any indications
of bias
The Competent Person considers that due to the
nature of the drilling and geology, sample bias is
unlikely to result from poor recovery.
All chips were logged qualitatively and
quantitatively.
A sample from each metre was collected and
stored in a chip tray for logging
Geological logs recorded lithology, colour and
weathering.
A composite sample of ~ 3kg for analysis was
taken using a scoop from each metre pile to
subsample 1 to 1.5kg sample. This was then
dispatched to the laboratory.
A second composite sample was similarly taken
and stored on site as a reference
Air core samples were a mix of wet and dry
Certified reference samples, duplicates and blank
samples were inserted into the sample stream
such as to represent approximately 5% of the
samples submitted to the laboratory for analysis
11
Criteria
JORC Code explanation
Quality of assay data and
laboratory tests
•
•
•
Verification of sampling
and assaying
•
•
•
•
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Commentary
•
•
•
•
•
•
“A Samples” were submitted for chemical analysis
using industry standard sample preparation and
analytical techniques including:
•
Riffle split all “A samples” to 50:50 bagging
one half as a coarse reject for storage
•
Pulverise the balance of the material via LM-5
•
Generate a standard 300g master pulp packet
•
Bag the balance as a bulk pulp master for
storage
Multi-Element Ultra Trace method ME-MS61r for
exploration in soils or sediments. 4-Acid digest on
0.25g sample analysed via ICP-MS and ICP-AES.
REEs included.
Certified reference samples, duplicates and blank
samples were inserted into the sample stream
such as to represent approximately 5% of the
samples submitted to the laboratory for analysis
No holes were twinned (duplicated).
Data stored in a database, with auto-validation of
logging data,
Multielement results (REE) are converted to
stoichiometric oxide (REO) using element-tostoichiometric conversion factors.
Element ppm
Ce
Dy
Er
Eu
Gd
Ho
La
Lu
Nd
Pr
Sm
Tb
Tm
Y
Yb
•
•
Location of data points
•
•
•
Data spacing and
distribution
•
•
•
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
•
•
•
•
•
•
•
Conversion Factor
1.1713
1.1477
1.1435
1.1579
1.1526
1.1455
1.1728
1.1371
1.1664
1.1703
1.1596
1.1510
1.1421
1.2699
1.1387
Oxide Form
CeO2
Dy2O3
Er2O3
Eu2O3
Gd2O3
Ho2O3
La2O3
Lu2O3
Nd2O3
Pr6O11
Sm2O3
Tb4O7
Tm2O3
Y2O3
Yb2O3
Rare earth oxide is the industry accepted form for
reporting rare earths. The following calculations
are used for compiling REO into their reporting and
evaluation groups:
TREO (Total Rare Earth Oxide)
= La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 +
Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3
+ Tm2O3 + Yb2O3 + Lu2O3 + Y2O3.
Note that Y2O3 is included in the TREO calculation.
Drill hole collars were located using a handheld
GPS to +/-5m accuracy
Grid system was MGA 94 Zone 51
Downhole survey was not undertaken, the holes
being vertical
No topography control was used, given the
relatively flat topography
Drilling intervals were closed to approximately
400m centres
Downhole samples were taken on 1m intervals
This drilling indicated excellent continuity,
particularly when supported by the results of the
Tempest Airborne Aeromagnetic Survey, which
was used to define basin limits.
Tempest Airborne Electromagnetic Survey (AEM),
12
Criteria
JORC Code explanation
applied.
Commentary
•
•
•
•
•
•
•
Orientation of data in
relation to geological
structure
•
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
•
•
•
•
•
undertaken by Xcalibur Multiphysics
Data collected using the TEMPEST EM system
(50Hz) using fixed wing aircraft.
Nominal flight height of 120 m above ground level.
GPS cycle rate of 1 second, accuracy 0.5m
Altimeter accuracy of 0.05m
Flight line spacing 400 to 800m.
Conductivity measurements and sampling interval
at approximately 11 to 12 metres along line.
This data when combined with further drilling will
be utilised to guide future mineral resource
estimation
Drillholes were vertical and approximately
perpendicular to mineralisation hosted in flat lying
clay-beds
This orientation is not considered by the
Competent Person to have introduced material
sampling bias.
For AEM data: Flight lines are North West- South
East: drainage and regolith patterns show a
regional slope down from NW to SE, whereas
geological structure is dominantly NE-SW.
The thickness of regolith presented in the crosssections is based on geophysical inversion
modelling conducted by the CSIRO. This inversion
modelling used Monte Carlo simulation known as
RJMCMC regression based on Bodin and
Sambridge (2009) https://doi.org/10.1111/j.1365246X.2009.04226.x & Minsley (2011)
https://doi.org/10.1111/j.1365-246X.2011.05165.x
with modifying parameters by CSIRO. refer ASX
Announcement 5 October 2022
The RJMCMC method uses a comparison method
to estimate the conductivity.
Sample security
•
The measures taken to ensure sample
security.
•
Samples were taken and dispatched by road
freight direct to the analytical laboratory
Aud