Presentation - Mineral Sands and Rare Earths Conference
Released
Released
Announcement PDF
Australian Critical
Rare Earth Minerals
Mineral Sands and Rare Earths Conference
19 and 20 March 2024
ASX I OD6
Important Information
Disclaimer
Forward Looking Statements
This presentation has been prepared by OD6 Metals Ltd (ACN 654 839 602) (OD6) and is current as
at the date of this document. The information contained in this presentation is for informational
purposes only and does not constitute an offer to issue, or arrange to issue, securities or other
financial products. The information contained in this presentation is not investment or financial
product advice and is not intended to be used as the basis for making an investment decision. The
presentation has been prepared without considering the investment objectives, financial situation
or needs of any particular person. Before making an investment decision, you should consider,
with or without the assistance of a financial adviser, whether an investment is appropriate
considering your particular investment needs, objectives and financial circumstances. Past
performance is no guarantee of future performance. Any securities that may be issued by OD6
should be considered speculative and there is no guarantee implied or explicit that there will be a
return on the capital invested or that any dividend will be paid or that there will be an increase in
the price or value of OD6âs shares in the future.
Certain statements contained in this presentation, including information as to the future financial or
operating performance of OD6 and its projects, are forward looking statements. Such forward
looking statements:
No representation or warranty, express or implied, is made as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, none of OD6, its directors, employees or
agents, nor any other person accepts any liability, including, without limitation, any liability arising
out of fault of negligence, for any loss arising from the use of the information contained in this
presentation. In particular, no representation or warranty, express or implied is given as to the
accuracy, completeness or correctness, likelihood of achievement or reasonableness or any
forecasts, prospects or returns contained in this presentation nor is any obligation assumed to
update such information. Such forecasts, prospects or returns are by their nature subject to
significant uncertainties and contingencies.
No New Information
The information in this report relating to the Mineral Resource estimate for the Splinter Rock
Project is extracted from the Companyâs ASX announcement dated 17 July 2023. OD6 confirms that
it is not aware of any new information or data that materially affects the information included in
the original announcement and that all material assumptions and technical parameters
underpinning the Mineral Resource estimate continue to apply.
This document contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the âAustralasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reservesâ (2012 JORC Code) and available for viewing at
https://www.od6metals.com.au/investors/asx-announcements/. OD6 confirms that it is not aware
of any new information or data that materially affects the information included in any original ASX
market announcement.
â˘
may include, among other things, statements regarding incomplete and uncertain proposals or
targets, production and prices, operating costs and results, capital expenditures, and are or may
be based on assumptions and estimates related to future technical, economic, market, political,
social and other conditions;
â˘
are necessarily based upon several estimates and assumptions that, while considered
reasonable by OD6, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; and
â˘
involve known and unknown risks and uncertainties that could cause actual events or results to
differ materially from estimated or anticipated events or results reflected in such forwardlooking statements.
OD6 disclaims any intent or obligation to update publicly any forward-looking statements, whether
as a result of new information, future events or results or otherwise. The words âbelieveâ, âexpectâ,
âanticipateâ, âindicateâ, âcontemplateâ, âtargetâ, âplanâ, âintendsâ, âcontinueâ, âbudgetâ, âestimateâ,
âmayâ, âwillâ, âscheduleâ and similar expressions identify forward looking statements. All forward
looking statements made in this presentation are qualified by the foregoing cautionary statements.
Recipients are cautioned that forward looking statements are not guarantees of future performance
and accordingly investors are cautioned not to put undue reliance on forward looking statements
due to the inherent uncertainty therein.
No representation is made that, in relation to the tenements the subject of this presentation, OD6
has now or will at any time in the future develop further resources or reserves within the meaning
of the Australian Code for Reporting of Exploration Results, Mineral resources and Ore Reserves
(The JORC Code).
2
Globally significant clay-hosted rare earth discovery
100%-owned project areas in one of the worldâs great mining jurisdictions
Splinter Rock
Maiden Inferred
Mineral Resource
Estimate1
â˘
344Mt at 1,308 ppm TREO
(at a 1,000ppm cut-off grade)
for ~450 kt contained TREO
â˘
MagREO represents an average
of ~23% of TREO grade for
~103 kt contained MagREO
â˘
Project situated in a first-class
location, close to port, roads
and essential infrastructure
1. Refer to ASX announcement 18 July 2023, âSplinter Rock Maiden Mineral Resourceâ, OD6 confirms that confirms that it is not aware of any new information or data that materially affects the information included in
that release. All material assumptions and technical parameters underpinning the release continues to apply and has not materially changed.
TREO (Total Rare Earth Oxide) = La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3 + Lu2O3 + Y2O3
MagREO (Magnet Rare Earth Oxide) = Nd2O3 + Pr6O11 + Tb4O7 + Dy2O3
% Magnet REO = (MagREO / TREO)*100
3
Investment highlights
1
Targeting critical, high-value magnet rare earth elements
Consumption expected to triple by 2035 with +10-20 new mines required to meet demand
2
Tier 1 jurisdiction with access to significant infrastructure and known tenure pathway
3
The premier Australian clay-hosted rare earth deposit
4
Strong metallurgical results
5
6
Prime location for future development
Largest and highest grade in Australia at 344Mt @ 1,308 TREO, with substantial further upside
Simple leach process with high recoveries of valuable MagREE â comparable or better with industry leading peers
A disciplined strategic approach to maximising value
In pursuit of the âbest of the bestâ as input to a future Scoping Study
Sustainably creating value
Acting with integrity to responsibility deliver rare earth resources for a low carbon future
4
Corporate snapshot
High calibre leadership team and tight capital structure
Capital Structure
ASX: OD6
Price per share1
A$0.086
Total number of shares on issue2
102.45M
Performance rights and options2
37.55M
Market capitalisation (undiluted)1
A$8.81M
Cash2
A$2.09M
Debt2
Nil
Enterprise value1
A$6.72M
Share Price History
A$/share
Dr Darren
Holden
Mr Brett
Hazelden
Mr Piers
Lewis
Dr Mitch
Loan
NON-EXECUTIVE
CHAIR
MANAGING
DIRECTOR
NON-EXECUTIVE
DIRECTOR
NON-EXECUTIVE
DIRECTOR
Register Detail
0.50
0.40
0.30
0.20
Founders (exc. Directors and Management)
40%
42%
Institutions
0.10
0.00
Mar 23
May 23
Jul 23
Sep 23
Nov 23
Jan 24
Directors and Management
5% 13%
Retail / Other
Mar 24
1. As at 15 March 2024
2. As at 31 December 2023. Refer to ASX announcement âQuarterly Activities and Cashflow Reportâ
Note: 47,435,249 shares (46%) escrowed until 22 June 2024
5
Rapid exploration and project advancement
Systematically adding value
1. Drilling
commences at
Splinter Rock
2. Immediate
outstanding
drilling success
4. Phase 2 drilling
completed at
Splinter Rock
6. Very high
metallurgical
recoveries
9. Low acid
consumption
confirmed
11. Screening
further lowers
acid consumption
Initial 179-hole
AC program for
5,862m of drilling
Results from first 65-hole
returns grades up to
6,729ppm TREO average
22.3% MagREO
Total 83 holes drilled for
4,305m at average depth
of 50m and max depth
100m
Up to 96% of MagREO acid
leach recoveries. Average
60 to 75%
Average 16 kg HCl/t ore
with multiple zones at 6-10
kg HCl/t ore
ANSTO test results showed
an average 35% reduction in
HCl consumption
1
2
4
6
Q3
22
Q4
22
Q1
23
Q2
23
3
5
7
3. Airborne
Electromagnetic
Survey completeâ
5. High-grade
REEs identified at
Grass Patch
7. Bumper
REE grades at
Splinter Rock
Vast scale of target âareas
identified with over
250km2 clay basins
mapped
Grades up to
3,340ppm TREO, with up
to 38.5% MagREO
74 out of 83 holes
returned significant high
grade TREO results
9
11
Q3
23
Q4
23
Q1
24
8
10
12
Q2
24
8. Maiden
10. Standout REE
12. Excellent
Mineral Resource grades at Centre bottle roll results
Estimate
Prospect
achieved
344Mt @ 1,308 ppm TREO
Inferred Resource at a
1,000ppm cut off grade
Refer to OD6 ASX Announcements https://www.od6metals.com.au/investors/asx-announcements/
Grades of up to 6,441 ppm
TREO returned with 77 holes
>1,000ppm TREO
Up to 90% with an
average 62% MagREE
returned at Splinter Rock
Targeting
increase and
upgrade to MRE
Q2 2024
Q3
24
Centre and
Prop drilling
results expected
Q3 2024
6
1. Critical magnet rare earth elements
Four critical, high value metals
hydrogen
helium
1
2
H
He
lithium
beryllium
boron
carbon
nitrogen
oxygen
fluorine
neon
3
4
5
6
7
8
9
10
B
C
aluminium
silicon
phosphorus
sulfur
chlorine
argon
13
14
15
16
17
18
Al Si
P
S Cl Ar
Li Be
sodium
magnesium
11
12
Light rare earth elements
Heavy rare earth elements
Na Mg
Light rare earth elements
59
Heavy rare earth elements
60
66
65
Pr Nd Dy Tb
Praseodymium
Neodymium
Dysprosium
Terbium
â˘
Electric vehicles
â˘
Electric vehicles
â˘
Electric vehicles
â˘
Xray's
â˘
Wind turbines
â˘
Wind turbines
â˘
Wind turbines
â˘
High temp fuel cells
â˘
Semiconductors
â˘
Nuclear reactors
â˘
Electric vehicles
â˘
Semiconductors
â˘
Wind turbines
â˘
Semiconductors
N O
F Ne
potassium
calcium
scandium
titanium
vanadium
chromium
manganese
iron
cobalt
nickel
copper
zinc
gallium
germanium
arsenic
selenium
bromine
krypton
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
K Ca Sc Ti V Cr Mn Fe Co Ni Cu Zn Ga Ge As Se Br Kr
rubidium
strontium
yttrium
zirconium
niobium
molybdenum
technetium
ruthenium
rhodium
palladium
silver
cadmium
indium
tin
antimony
tellerium
iodine
xenon
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Rb Sr Y Zr Nb Mo Tc Ru Rh Pd Ag Cd In Sn Sb Te
I Xe
cesium
barium
hafnium
tantalum
tungsten
rhenium
osmium
iridium
platinum
gold
mercury
thallium
lead
bismuth
polonium
astatine
radon
55
56
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
Cs Ba
Hf Ta W Re Os Ir Pt Au Hg Tl Pb Bi Po At Rn
francium
radium
rutherfordium
dubnium
seaborgium
bohrium
hassium
meiterium
darmstadtium
roentgenium
copernicium
nihonium
flerovium
moscovium
livermorium
tennessine
oganesson
87
88
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
Fr Ra
Rf Db Sg Bh Hs Mt Ds Rg Cn Nh Fl Mc Lv Ts Og
lanthanum
cerium
praseodymium
neodymium
promethium
samarium
europium
gadolinium
terbium
dysprosium
holmium
erbium
thulium
ytterbium
lutetium
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
La Ce Pr Nd Pm Sm Eu Gd Tb Dy Ho Er Tm Yb Lu
actinium
thorium
protactinium
uranium
neptunium
plutonium
americium
curium
berkelium
californium
einsteinium
fermium
mendelevium
nobelium
lawrencium
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
Ac Th Pa U Np Pu Am Cm Bk Cf Es Fm Md No Lr
7
1. Significant future global demand expected
Consumption expected to triple by 2035 with multiple new mines required to meet demand
NdPr Production and Demand (real)
(tonnes p.a.)
Demand growth
anticipated to accelerate
between 2025 and 2035
Transition from carbon
to renewable economy driving
demand for critical magnet rare earth
elements, with
7.1% CAGR expected
Demand underpinned by
growth from electric vehicles, wind
power and consumer electronics
NdPr market growth
projections require supply levels to
grow by approximately 80% by
2035 to meet forecast demand â this
is equivalent to +10-20 new mines
Eg ARU = ~3,700tpa NdPr
Source: Project Blue Energy transition outlook to 2050, November 2023, Lynas (ASX: LYC), Adamas and Company Presentations
8
1. New Australian supply urgently needed
Mine concentration is a significant risk to the global supply chain
2022 Existing global mine production (t)
140,000
China continues to
dominate both mine
production and
downstream processing
Diversity of supply is a
priority for governments
and corporations with
Australia well placed to
provide additional
capacity
Myanmar Supply risk
could see price increase
38,000
30,000
17,000
100
500
1,000
1,000
2,000
2,700
3,000
8,000
Source: USGS Mineral Commodity Summaries, Rare Earths pubs.usgs.gov/periodicals/mcs2023/mcs2023.pdf
Benchmark Minerals â Rare earth supply strong in 2024 but Myanmar risk remainsâ
9
2. Prime location for future development
Existing infrastructure a key differentiating factor
Established Esperance township
â˘
â˘
Proximate to large
coastal town Esperance.
Local workforce
potential for any future
development
Serviced by existing road network
â˘
Established, well
maintained road
network connecting
Splinter Rock and Grass
Patch to town and port
Ready access to Esperance bulk port
â˘
â˘
â˘
Esperance Port handles
over 200 ships p.a.
Cape size vessel capacity
Regular container ships
link to the export market
Local renewable power connected
â˘
â˘
Proven renewable cap
Esperance has Dual
4.5 MW wind turbines
plus 4 MW solar farm
and gas turbines
10
3. The premier Australian clay-hosted REE project
Inferred Resource of 344Mt @ 1,308ppm TREO with substantial upside from high-grade Inside Centre discovery
Rare earth element deposits
Enterprise value (A$M)
(bubble size reflects contained TREO)
3000
518
2000
386
1500
1000
500
WC1
China
Longnan
AR3
ABX MEK
OD6
BRE
HRE
VTM
IXR
China
Xinfeng
Tantalus
China
Xunwu
Serra
Verde
63
0
0
100
200
300
400
500
600
700
Resource Tonnage (Mt)
Refer to âPeer calculation and reference detailsâ
Source: Adapted from Euroz Hartleys Research Report, Company Reports, Phillip Hellman, Sharemarket Market Capitalisation
800
900
1000
High valuation rerate potential
based on TREO
grade and
potential Mineral
Resource tonnage
expansion
43
20 11 7 7
3 3 1
BRE
MEI
VMM
MEK
VTM
ABX
OD6
AR3
WC1
KTA
HRE
TREO Grade (ppm)
MEI
Aclara
2500
Targeting Mineral Resource
expansion based on recent phase
three drilling results
11
3. Exceptional Phase 3 drilling success
Real and substantial upside potential in updated Mineral Resource estimate due in Q2 2024
Significant results at Centre and Inside Centre prospects1
â˘
58 metres at 2,060ppm TREO (21.8% MREO) from 21 metres (SRAC0356)
â˘
77 metres at 1,429ppm TREO (22.5% MREO) from 18 metres (SRAC0357)
â˘
69 metres at 1,457ppm TREO (25.6% MREO) from 15 metres (SRAC0358)
â˘
66 metres at 1,519ppm TREO (21.0% MREO) from 21 metres (SRAC0359)
â˘
52 metres at 1,467ppm TREO (29.6% MREO) from 21 metres (SRAC0333)
â˘
42 metres at 1,609ppm TREO (21.4% MREO) from 18 metres (SRAC0470)
â˘
41 metres at 1,611ppm TREO (26.4% MREO) from 6 metres (SRAC0298)
â˘
43 metres at 1,425ppm TREO (23.4% MREO) from 12 metres (SRAC0300)
â˘
24 metres at 2,379ppm TREO (25.5% MREO) from 18 metres (SRAC0303)
â˘
30 metres at 1,806ppm TREO (27.5% MREO) from 42 metres (SRAC0321)
â˘
34 meters at 1,465ppm TREO (23.2% MREO) from 36 metres (SRAC0469)
â˘
43 meters at 1,425ppm TREO (21.8% MREO) from 12 metres (SRAC0300)
â˘
31 meters at 1,339ppm TREO (22.6% MREO) from 21 metres (SRAC0328)
â˘
30 meters at 1,309ppm TREO (22.5% MREO) from 21 metres (SRAC0351)
â˘
24 meters at 1,810ppm TREO (21.5% MREO) from 48 metres (SRAC0340)
â˘
21 meters at 1,672ppm TREO (24.0% MREO) from 15 metres (SRAC0297)
Inside Centre â Thick, high-grade mineralisation
Inside Centre is a new 2km x 1km discovery that is up to
69m thick, with grades of 1,400ppm to 2,200ppm TREO and
has the potential to be a standout first stage project
12
3. What does an economic project look like?
Splinter Rocks meets all the âKey Value Driversâ and has the hallmarks of a highly economic project
Key Value Drivers
Clay volume
treated (tpa)
TREO
(ppm)
Metallurgical
TREO
MagREO produced
%
recovery produced (tpa)
@23% (tpa)
payable
AUD:USD
Revenue p.a. @
US$50/kg TREO
â Grade >1,000 ppm TREO
â MagREO content >20%
â Treatment rate > 4 Mtpa
â Mine life >20 years
â Resource size >150 Mt
â Recovery >50%
â Low stripping ratio
â Low reagent usage / cost
â Low power costs
10,000,000
1,500
60%
9,000
2,070
70%
0.65
A$484M
7,500,000
1,500
60%
6,750
1,553
70%
0.65
A$363M
5,000,000
1,500
60%
4,500
1,035
70%
0.65
A$242M
5,000,000
1,000
60%
3,000
690
70%
0.65
A$161M
5,000,000
800
60%
2,400
552
70%
0.65
A$129M
4,000,000
800
60%
1,920
442
70%
0.65
A$103M
3,000,000
800
60%
1,440
331
70%
0.65
A$ 77M
2,000,000
800
60%
960
221
70%
0.65
A$ 51M
1,000,000
800
60%
480
110
70%
0.65
A$ 25M
This is conceptual in nature, but is used as a basis for the 1,000ppm resource cut-off
and the âreasonable prospects of eventual economic extractionâ under JORC
13
4. Already strong metallurgical results
Identifying the best metallurgical areas to further refine potential processing route
⢠Very high metallurgical recoveries achieved using
simple acid leach
⢠Average 62% MagREO recovery (range 43% to 87%) at
20g/l HCl
⢠Average 16 kg HCl/t ore with multiple zones at 6kg to
10kg HCl/t ore
Centre
Prospect
Scrum
Prospect
40% to 90%
recoveries
(average 60%)
40% to 89%
recoveries
(average 65%)
⢠Extractions at 15g/L to 20 g/L HCl appear to be a
balance point on recovery, acid strength and acid
consumption.
⢠Neodymium (Nd), Praseodymium (Pr), Terbium (Tb) and
Dysprosium (Dy) have very similar recoveries
⢠Screening of coarse-grained material expected to
reduce leach material by 30-50% without appreciable
loss of MagREO
⢠Recent recovery trials to identify âbest of the bestâ areas
Recoveries only reflect initial rare earth leaching, with further losses expected in precipitation, impurity removal, purification and drying.
Prop
Prospect
44% to 96%
recoveries
(average 71%)
Flanker
Prospect
41% to 96%
recoveries
(average 53%)
14
4. Magnet rare earth recovery
OD6 has closed the gap to its industry leading peers on MagREE recoveries
OD6 Metals (~A$7M EV)
Refer to âPeer calculation and reference detailsâ â, and OD6 ASX Announcement 27-2-2024
Note: OD6 recoveries represent results from the Centre prospect
Meteoric Resources (~A$392M EV)
15
4. Clay-hosted rare earths
Similar to IAC, clay-hosted REEs present a highly attractive processing option in a tier-1 jurisdiction
Clay-hosted REE
â˘
Esperance, Western Australia â Tier-1 mining jurisdiction with
access to significant infrastructure
Locations
â
Exploration
â ⢠Quick and low-cost exploration: shallow air core drilling
Mining
â ⢠Pits backfilled and rehabilitated
Processing
â
â˘
Surface mining, within minimal strip ratio
â˘
â˘
â˘
â˘
Chloro-Alakli plant makes both acid and base onsite
Simple 6 hour leach in hydrochloric acid ($250/t)1
Requires more tanks for leaching process
Sodium hydroxide to neutralise solution ($250/t)
Recoveries
â ⢠Up to 90% (62% average)
Payability
â
â˘
High recoveries containing valuable light and heavy rare
earths (Nd, Pr, Dy, Tb)
Ionic Clay-hosted (IAC) REE
â
â˘
South America, Brazil
â
â˘
Quick and low-cost exploration: shallow air core drilling
â
â˘
â˘
Surface mining, within minimal strip ratio
Pits backfilled and rehabilitated
â˘
â˘
â˘
Ionic process needs multiple offsite produced reagents
Simple 0.5 hour leach in ammonium sulphate ($350/t)1 and
sulphuric acid ($300/t)1
Ammonium bicarbonate to neutralise solution ($350/t)1
â
â˘
Up to 95%2 (46.2% average)3
â
â˘
High recoveries containing valuable light and heavy rare
earths (Nd, Pr, Dy, Tb)
â
Refer to âPeer metallurgy results reference details
Note: (1) All figures are estimated/verbal current supplier pricing, (2) MEI MagREE recoveries at Calderia, (3) Average MagREE recoveires across MEI, VMM and Alcara
16
5. A disciplined strategic approach
In pursuit of the âbest of the bestâ for maximum value creation
Explore
â˘
â˘
â˘
â˘
â˘
Identify high-grade, âsweet-spotâ
REE zones
Aggressively grow Mineral
Resources via latent scale potential
Target thick areas
with low strip ratio potential
Low-cost exploration, high value
for money
CSIRO collaboration
Advance
Design
â˘
â˘
â˘
â˘
Optimise leach recovery and
impurity removal
Remove coarse grain material to
reduce acid consumption
Produce a MREC with potential
conversion to REO
Refine process with ANSTO
â˘
â˘
â˘
â˘
â˘
Pursue âBest of the Bestâ grade,
recovery, stripping ratio and acid
consumption
Integrate ChlorAlkali Benefits
Renewable energy sourcing â
solar / wind
Existing Infrastructure â port, road
Deliver Scoping Study
17
5. Growth and infill drilling scheduled through 2024
Targeted drilling focused on building and refining sizeable Mineral Resource base
Centre and Prop
Prospects
Infill drilling at Centre and Prop for potential
Mineral Resource estimate upgrade
Centre, Flanker and Scrum
Prospects
Extensional drilling at Centre, Flanker and Scrum
for Mineral Resource estimate growth
Loosehead and Tighthead
Prospects
Regional drilling at Loosehead and Tighthead for
new discovery potential
18
5. Scheduled program of activities
Rapidly advancing and de-risking
2024
MRE upgrade
Q1
Q2
Q3
High grade initial MRE at Inside Centre
Infill drilling
Drilling at Centre and Prop
Extensional drilling
Drilling at Centre, Flanker and Scrum
Regional exploration
Met optimisation
Scoping Study
Q4
Drilling at Loosehead and Tighthead
Refine process with ANSTO
MREC
Deliver Scoping Study
19
6. Sustainably creating value
Acting with integrity to responsibly deliver rare earth resources for a low carbon future
Our sustainability priorities:
ESG
Workplace health
and saftey and
mental health
Our aim is to minimize our
environmental impact, look
after our people and grow
with our communities to
create value for our
investors
Aboriginal and
Traditional Owner
engagement
Integrity and
ethical business
practices
RISK
Regulatory
compliance and
change
Focused on
protecting local
flora and fauna
Corporate
governance and risk
management
20
6. The Splinter Rock Project
A world-class clay-hosted REE asset progressively being de-risked
W.A.
Located in Western
Australia, a tier 1
jurisdiction
$$
No farming
activities on
MRE area
P
Strong
community
engagement and
support for mining
Clean, simple
capital structure
Regional
renewable energy
integrated into grid
P
First pass
environmental
reconnaissance
surveys complete
$
P
P
No private
royalties payable
Heritage
surveys clear
to date
No commodity
restrictions on
tenement areas
21
Significant relative value upside potential
Significant upside potential compared to peers
Comparison of enterprise value per MagREO tonne
Key catalysts for
relative value uplift
relative to peers on per tonne
MagREO basis
(A$/tonne MagREO)
Strong foundation
for growth potential and
leverage to increase in
rare earth prices
3,490
⢠Targeting Mineral Resource Estimate
upgrade and expansion in Q2 2024
⢠Inside Centre Prospect has potential to
be a standout first stage project
1,496
988
965
⢠Further regional exploration scheduled
with success to expand resource base
727
345
BRE
MEI
ABX
IXR
VTM
AR3
66
58
26
OD6
WC1
HRE
⢠Metallurgical optimisation ongoing with
high recoveries and low acid
consumption de-risking project
flow-sheet and future economics
⢠Scoping Study targeted by end of 2024
Refer to âPeer calculation and reference detailsâ
22
Appendix
ASX I OD6
Airborne Electromagnetic (AEM) Success
State of the art AEM Modelling by CSIRO
Salt water
⢠AEM has facilitated mapping of clay
locations, expanse and potential thickness
⢠400km2 of clay basins mapped
⢠Clays are conductive, and are readily
mapped with AEM (yellow to red colours).
A
Salt water
⢠Granites are not conductive (blues to
green)
⢠210 out of 228 holes (~92%) returned
significant high grade TREO results from
last two drill programs
B
Salt water
⢠Sydney Harbour is 55 km2 (1)
(1) Source: Sydney Harbour Our greatest Asset August 2019
Refer to ASX announcement 15 December 2022, âAEM shows Vast Scale of Target Areasâ
24
Conceptual Geological Formation
Collaborating with CSIRO to model the clay basins
Low
High
25
Indicative processing steps
Simplified process map to deliver rare earth products
MREC/H
Mixed Rare Earth
Excavate
Transport
Screen
Acid leach
Purify
Precipitate
Mine near
surface clays
Clays to
processing plant
Coarse material
removal
Rare Earths leached
into solution
Removal of
impurities
eg Al, Fe, U, Th
Rare Earth carbonate
precipitation
HCl
acid
HCl acid
Salt
Renewable
power
Water
No drill and
No crushing
blast
No flotation
No milling
Solvent extraction
and separation
NaOH
base
P
No drill & blast
NoNo
milling
crushing
RE Separation
NaOH base
Chlor-alkali process
HCl
NaOH
Na2CO3
or
NaOH
NaOH
base
H2O
NaCl
Mixed RE Carbonate or
Hydroxide product
flotation
NoNo
high
temperature
No high
temperature
cracking
cracking
Recycle saline water
Rehabilitate
Transport
Clay Washing
Site revegetated
Clays returned to
mine void
Clay washing,
neutralisation and
filtration
Clay
Rare Earths
Water
Reagents
REOs
Oxides
Individual Rare Earth
oxides Nd Pr Dy Tb
No high
No high
pressure
leach
pressure leach
No high
No high
temperature
temperature
leach leach
26
Acid consumption and reagent costs
Important to consider total reagent requirements, not just one step in the process
⢠Vendor discussions confirm viability of
potential site-based chlor-alkali facility
⢠Indicative pricing for a chlor-alkali
electrolyser is approximately ÂŁ3M each
(A$5.7M)
⢠Chlor-alkali plant also provides a
sodium hydroxide (NaOH) co-product
which is utilised in impurity removal
and precipitation of a final Mixed Rare
Earth Product (MREC/H)
⢠A single chlor-alkali electrolyser has the
potential to produce 62ktpa HCl and
69ktpa of NaOH which, at an average
consumption of 16 kg HCl / tonne of
ore, is sufficient to treat ~4Mtpa of REE
bearing clay
2H2O (l) + 2NaCl (aq) ----> H2 (g) + Cl2 (g) + 2NaOH (aq)
H2 (g) + Cl2 (g) -----> 2HCl (g)
Refer to publicly available information associated with a BICHLOR
Electrolyser,
27
Clay-hosted REE projects â whatâs the difference?
Processing steps are similar, mainly using different reagents and time
Aclara and Meteoric Proposed Flowsheet
OD6 Proposed Flowsheet
No drill & blast
No crushing
No milling
No flotation
Key points to note
â˘
â˘
â˘
â˘
â˘
â˘
OD6 Longer leach times = more tanks
Both process use acid to lower the pH to 1 and 3 to 4
Both process need to neutralise the acid to remove
impurities and produce a MREC/H
Lower pHs have more impurities to remove
Chloro-Alakli plant makes both acid and base onsite
Ionic process needs multiple offsite produced reagents
â˘
â˘
â˘
â˘
No high
temperature
Reagents and estimated costs
cracking
Hydrochloric Acid + Sodium Hydroxide
No high
$250/t HCl1 + $250/t NaOH (Chlor-alkali onsite)
pressure leach
Ammonium Sulphate + Sulphuric Acid + Ammonium
Bicarbonate: $350/t (NH4)2SO4 + $300/t H2SO4No
+ high
$350/t (NH4)HCO3 2
temperature
Consumption Rates are Key to Total Reagent Cost
leach
All projects will need Flocculants, Potable Water, other
chemicals
Note: (1) Assuming renewable power, capital paid upfront, (2) All figures are estimated/verbal current supplier pricing ex-works
28
Metallurgical test program moving forward
Working with ANSTO to methodically optimise the process
⢠Review leach performance of upgraded fines fractions following screening @75 ¾m
⢠Undertake sighter bottle roll tests of selected Phase 3 and 2 drill samples
⢠Bench scale tests to assess and determine preferred slurry densities and further optimise leach conditions
⢠Slurry leach tests to assess slurry handling, filtration and washing
⢠Impurity removal trials at various pH conditions, temperatures and reagents
⢠Assess potential use of Resins in pulp and liquid to assist in impurity removal
⢠Assess Ion Exchange on âleachâ liquor and selective elution of REE versus impurities eg Al,Fe
⢠Assess Nanofiltration to produce a retentate with increased REE concentration, and a permeate
consisting of âcleanâ acid for recycle
⢠Mixed rare earth precipitation of carbonates and hydroxides
⢠Process modelling and techno-economic comparison of overall flowsheet options
⢠Mini pilot scale testing of composited bulk samples
⢠Apply process model to assess various options to convert the mixed rare earth carbonate/hydroxide in a
downstream refinery to multiple potential rare earth oxides
29
Splinter Rock Mineral Resource estimate
At 1,000 ppm cutoff grade
Prospect Category
Australiaâs
highest grade
and largest clay
hosted MRE
Delineated from
less than 5% of
identified target
area
Tonnes
(Mt)
TREO
(ppm)
Pr6O11
(ppm)
Nd2O3
(ppm)
Tb4O7
(ppm)
Dy2O3
(ppm)
MagREO
MagREO
(ppm) (% of TREO)
Centre
Inferred
149
1,423
71.2
2
Share your feedback
Discover