Investor Briefing Webinar - Amended
Released
Released
Announcement PDF
ASX Announcement
30 July 2026
AASX: OD6
1
Investor Briefing Webinar
OD6 Metals Limited (OD6 or the Company) is pleased to advise shareholders
and investors that the Company will be conducting a live investor briefing
webinar to present a technical geological overview of recent progress at the
Company’s Quinn Project in Nevada, USA - a strategically positioned U.S.
fluorspar and precious metals opportunity.
Following the webinar, OD6 Managing Director and CEO, Brett Hazelden will co-
host a live interactive Q&A session alongside Geological Advisor – Dr Darren
Holden.
The Company invites shareholders, investors and media to participate in this
online event by registering via the link below:
WEBINAR URL: https://bit.ly/4fGdrRo
DATE: Friday, 31 July 2026
TIME: 11.00 am (AWST) / 1.00 pm (AEST)
DURATION: ~ 30mins
The Company also encourages participants to send questions in advance to
Lucas Robinson at info@corporatestorytime.com
A link to the replay of the webinar will be posted on OD6’s social media as soon
as it is available for those unable to attend the webinar.
2
About OD6 Metals
OD6 Metals Ltd is an Australian critical minerals exploration and development company with projects spanning fluorspar,
rare earth elements and copper across the United States and Australia.
OD6 aims to position itself as an emerging supplier of strategically important critical minerals required for next-generation
industrial, defence and energy technologies.
Quinn Fluorspar Project – Nevada, USA
OD6 is advancing the Quinn Fluorspar Project located in Nevada, USA, one of the world’s premier mining jurisdictions and
currently ranked second globally in the Fraser Institute 2025 Mining Attractiveness Index.
Quinn hosts multiple high-grade fluorspar deposits across 226 mining claims (4,670 acres / 1,890ha) including Horseshoe,
Mammoth and Big Jim, with historical drilling, channel sampling and testwork confirming significant high-grade
mineralisation and potential for both Metspar and premium Acidspar products.
Fluorspar is classified as a critical mineral in the United States, which currently imports 100% of all Fluorspar consumed
domestically with >60% of all global supply sourced from China. It is essential in hydrofluoric acid production, AI
semiconductor manufacturing, advanced battery technologies, uranium enrichment, defence systems and refrigerants.
Splinter Rock Rare Earth Project – Western Australia
OD6’s 100% owned Splinter Rock Rare Earth Project in Western Australia hosts one of Australia’s largest and highest-grade
clay-hosted rare earth deposits, with a Mineral Resource Estimate of:
• Indicated: 119Mt @ 1,632ppm TREO
• Inferred: 563Mt @ 1,275ppm TREO
OD6 is advancing an innovative processing flowsheet utilising heap leaching, nanofiltration and ion exchange technologies
designed to achieve ~75% Nd & Pr overall recovery plus produce a high-quality Mixed Rare Earth Carbonate/Hydroxide
product of ~56-59% TREO with low impurity levels
Gulf Creek Copper Project – New South Wales
OD6 is also advancing the Gulf Creek Copper-Zinc VMS Project in New South Wales, a historically high-grade copper mining
district with significant exploration upside.
Recent drilling and geophysical programs have confirmed high-grade copper mineralisation and identified multiple large-
scale exploration targets along more than 10km of prospective strike.
Corporate Directory
Managing Director
Non-Executive Chairman
Non-Executive Director
Joint Company Secretary
Joint Company Secretary
Technical Advisor to the Board
Contact
OD6 Metals Ltd
ACN 654 839 602
www.od6metals.com.au
Email: info@od6metals.com.au
Phone: +61 8 6189 8515
Level 1, 1 Alvan Street, Subiaco, WA 6008
Mr Brett Hazelden
Mr Piers Lewis
Dr Mitch Loan
Mr Lewis Flynn
Mr Joel Ives
Dr Darren Holden
Investor Relations
Lucas Robinson
Corporate Storytime
lucas@corporatestorytime.com
Phone: +61 408 228 889
3
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which have
been cross-referenced to previous market announcements made by the Company. The Company confirms that it is
not aware of any new information or data that materially affects the information included in the relevant market
announcements.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted
from the Company’s ASX announcements dated 18 July 2024. OD6 confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply.
Share your feedback
Discover