Quarterly Activities and Cashflow Report
OD6 Metals Limited (OD6 or the Company) is pleased to present its Quarterly
Activities and Cashflow Report for the period ending 30 June 2023
Highlights (including subsequent events):
•
•
Second phase Aircore drilling at Splinter Rock Project, located NE of Esperance in Western Australia, delivers
bumper Rare Earth element (REE) assay results
−
Grades averaged in excess of 1,000 ppm Total Rare Earth Oxides (TREO), with extensive clay
thickness of between 20 and 80m at consistently high grades
−
Very high drill success rate, with 74 of the 83 holes returning significant grades and thickness
−
Continuity of grade and thickness extends over multiple kilometres of drill lines.
−
High value Magnet Rare Earth Oxides (MREO) represent an average of ~22% of TREO grade
−
Drill results strongly correlate with interpreted data from Airborne Electromagnetic Survey (AEM),
validating geological modelling and exploration program design.
Very high metallurgical recoveries of Magnet Rare Earth Elements (MagREE) utilising a simple hydrochloric
acid leach were achieved in multiple prospect areas at Splinter Rock
−
Prop Prospect – 44% to 96% recovery of MagREE (average 71%)
−
Centre Prospect – 54% to 78% recovery of MagREE (average 62%)
−
Scrum & Flanker Prospects – 64% and 76% recovery of MagREE respectively (one sample each)
−
The results provide considerable confidence to proceed with further optimisation test work in
parallel with targeted infill drill programs at the four main Prospect Areas
•
$180,000 Co-funded drilling Grant from the Western Australian Governments Exploration Incentive Scheme
(EIS) to be utilised on its flagship Splinter Rock
•
Phase Three drilling commenced at Splinter Rock.
−
Planned 188-hole, 10,000m program aims to test the length (up to 20km) of the main prospects,
plus determine the continuity of grade and thickness of the extensions
−
Initial drilling program expected to be completed over a 6 to 8 weeks period
−
Assay results anticipated to be available at the end of Q3 2023
•
Our highly focused exploration spend of $898k continues to deliver impressive results
•
Cash balance at the end of the June quarter was A$3.5M
1
Exploration and Development (including subsequent events)
Bumper Phase 2
OD6 reported drill assay results for the Phase 2 drilling at Splinter Rock (refer ASX release, 18
Assay Results at
April 2023). Highlights included:
Splinter Rock
•
Bumper assay results and clay thicknesses returned from the second phase, 83-hole
drill program, with higher grades and larger thicknesses than those observed in the
initial impressive program
•
Grades of up to 6,605 ppm Total Rare Earth Oxides (TREO) returned, with extensive
clay thickness of between 20 and 80m at consistently high grades
•
Very high success rate, with 74 of the 83 holes returning significant grades and
thickness
•
Continuity of grade and thickness extends over multiple kilometres of drill lines.
•
New deep channel confirmed at Centre, with 1km width and mineralisation >70m
thick
•
High value Magnet Rare Earth Oxides (MREO) represent an average of ~22% of TREO
grade
•
Drill results strongly correlate with interpreted data from Airborne Electromagnetic
Survey (AEM), validating geological modelling and exploration program design.
•
All assays using 4-acid soluble digestion (i.e. does not assay for resistate non-acid soluble
REE minerals)
Significant high-grade clay-hosted rare earth intersections include:
•
69 metres at 1483ppm TREO (21.1% Magnet REO) from 24 metres (SRAC0227)
•
66 metres at 1516ppm TREO (20.2% Magnet REO) from 15 metres (SRAC0226)
•
55 metres at 1781ppm TREO (23.2% Magnet REO) from 21 metres (SRAC0218)
•
71 metres at 1330ppm TREO (21.3% Magnet REO) from 15 metres (SRAC0225)
•
36 metres at 1615ppm TREO (21% Magnet REO) from 21 metres (SRAC0217)
•
29 metres at 1882ppm TREO (28.2% Magnet REO) from 18 metres (SRAC0271)
•
43 metres at 1217ppm TREO (20.5% Magnet REO) from 12 metres (SRAC0235)
•
27 metres at 1792ppm TREO (23.2% Magnet REO) from 18 metres (SRAC0265)
•
60 metres at 761ppm TREO (25.7% Magnet REO) from 18 metres (SRAC0274)
•
43 metres at 1029ppm TREO (24.5% Magnet REO) from 30 metres (SRAC0238)
•
44 metres at 955ppm TREO (22.8% Magnet REO) from 24 metres (SRAC0268)
•
57 metres at 735ppm TREO (22.9% Magnet REO) from 30 metres (SRAC0240)
•
37 metres at 1124ppm TREO (24.3% Magnet REO) from 21 metres (SRAC0263)
•
29 metres at 1394ppm TREO (19.7% Magnet REO) from 21 metres (SRAC0207)
•
37 metres at 1,067ppm TREO (22.4% Magnet REO) from 18 metres (SRAC0215)
•
27 metres at 1,436ppm TREO (24.1% Magnet REO) from 15 metres (SRAC0272)
•
38 metres at 1,013ppm TREO (23.1% Magnet REO) from 21 metres (SRAC0193)
•
32 metres at 1,200ppm TREO (22.8% Magnet REO) from 6 metres (SRAC0234)
•
24 metres at 1,517ppm TREO (25.7% Magnet REO) from 15 metres (SRAC0273)
2
All four of the main prospect areas return impressive results with Centre highlighting a new deep
channel, with 1km width averaging at ~1,500ppm TREO and mineralisation >70m thick as seen in
Figure 1 below.
Figure 1: Centre Prospect Cross Section (vertical exaggeration x6)
Very High
OD6 reported metallurgical leach test results for Splinter Rock (refer ASX release, 3 April
MagREO
2023).
Recoveries
Achieved at
A total of 25 samples were selected from a wide variety of distinct clay and non-clay types at
Splinter Rock
the Splinter Rock Project to identify the various potential mineral recovery variations across
the four main Prospects (Prop, Centre, Scrum and Flanker). Samples were selected based on
differing geographic location, REE grade, colour, chemical composition, AEM Conductivity,
proximity to granite, basinal position (including paleo valley/channel positions) and inferred
different geological genesis.
The Splinter Rock clay hosted prospect areas are characterised by a combination of ionically
adsorbed, acid soluble and refractory rare earth elements (REEs). Future potential commercial
production of Rare Earth Elements (REEs) is significantly improved through successful leaching
of both ionic and acid soluble REEs.
ANSTO was selected to complete Splinter Rock metallurgical testing given their extensive
experience in rare earth process development. The objective of the work program was to:
•
determine the leachability of rare earths, under acidic conditions
•
assess the potential to upgrade the REEs by separating out a fine fraction
•
identify areas of high recoveries and grades to prioritise advanced-stage infill drilling
3
Highlights included:
•
A number of areas of Excellent metallurgical recoveries have been identified at all four
prospects, with highest recoveries achieved at Prop, Centre and Flanker.
•
The best metallurgical results came from areas within the clay basins and channel areas
and away from the granite boundaries
•
Prop Prospect: five clay-basin composite samples with 44% to 96% recovery of MagREE
(average 71%)
•
Centre Prospect: three clay-basin composite samples with 54-78% recovery of MagREE
(average 62%)
•
Flanker Prospect: one clay-basin composite sample with 76% recovery of MagREE
•
Scrum Prospect: one clay-basin composite sample with 64% recovery of MagREE
•
Control samples on margin of fresh granite or saprock (partially weathered granite) or
areas of carbonaceous shales or paleo-channel sediments show lower recoveries.
•
Metallurgical results and Airborne Electromagnetic Survey (AEM) correlate the areas of
high recoveries within clay basins and channel areas (target areas) and areas located
on the margins of the granites that have shown lower recoveries, (avoidance areas)
•
Impressive leach response with similar MagREE recoveries being achieved between a
3 hour and 6 hour leach suggesting fast reaction kinetics
•
Low acid conditions over a longer leach duration achieved similar recoveries, to higher
concentration suggesting further reductions in acid strength will be possible
•
Particle size analysis reveals ~80-90% of MagREE are hosted in -75μm size fraction.
•
Potential to remove 30-50% of the gangue material with a corresponding upgrade in
head grade for only a minor loss in REEs identified through removal of coarse grained
clays size fraction (>75um) material.
•
The results provide confidence to proceed with highly targeted optimisation test work
and infill drill programs at the four main Prospect Areas
•
Fusion digest can increase head grade by up to 30% over a 4-acid leach assay
•
Mineralogy comparison of selected solid samples are underway with results expected
Q2 2023
Based on the positive initial diagnostic leach outcomes and the potential to upgrade the REE
by removal of coarse material, further stages of work are proposed to be undertaken at
ANSTO, which will involve more diagnostic tests to define optimum leach conditions. This will
include existing and new samples from the recently completed infill drilling campaign at
Splinter Rock to target the identified areas of high grades and recoveries .
$180k WA
OD6 announced that it was a successful applicant for the Western Australia Government’s
Government
Exploration Incentive Scheme (EIS) Co-funded drilling program with funds to be utilised on its
Co-funded
flagship Splinter Rock clay hosted rare earth project (refer ASX release, 24 April 2023).
Drilling Grant
•
The EIS is a State Government initiative that aims to encourage exploration in
Western Australia for the long-term sustainability of the State’s resources sector.
4
•
The Co-funded Exploration Drilling Program is a flagship program of the EIS. It is a
competitive program, open for applications twice a year, which offers up to a 50 per
cent refund for innovative exploration drilling projects, capped at specific amounts.
•
OD6 has been offered the maximum of $180,000 under the co-funded drilling
program
•
Drill funding is for both diamond core and aircore drilling.
o
Diamond core drilling will provide valuable samples for metallurgical analysis
o
Aircore drilling will test the mineralisation length, depth, thickness and grade
of the clay basins
Splinter Rock
OD6 advised the market that phase 3 drilling has commenced at its Splinter Rock Clay Hosted
Phase 3 Drilling
Rare Earth Project (refer ASX release, 8 June 2023)
Program
•
Drill program is targeted using the successful Airborne Electromagnetic (AEM) Survey
Commences
•
Planned 188-hole, 10,000m program aims to test the length (up to 20km) of the main
prospects, plus determine the continuity of grade and thickness of the extensions
•
Initial drilling program expected to be completed over a 6 to 8 weeks period
•
Assay results anticipated to be available at the end of Q3 2023
•
As at the end of the quarter 67 holes totalling 3,242 metres had been completed
Figure 2: Splinter Rock Project Planned drilling locations and tracks for Q2 2023
5
Heritage Surveys
Progressing at
Heritage Surveys were completed for the Phase 3 drilling program at Splinter Rock with the
Ngadju Native Title Aboriginal Corporation.
Splinter Rock
Phase 2 ANSTO
Phase 2 metallurgical testing commenced at ANSTO during the quarter and aims to:
Metallurgical
• Develop further understanding of the leachability of rare earths under lower acid or
desorption conditions over a longer leach time frame
Tests Commenced
• Understand leach performance using saline water vs fresh water.
• Test the leach performance of the coarse and fines fractions following screening at
75 µm
• Develop a standard test procedure for the screening of a large number of test
samples for potential RE recovery
62 new metallurgical samples have been sent to ANSTO for initial acid leach tests. These
samples have been selected from a wide variety of different clays, locations and depths to
continue to build an geo-metallurgical understanding of recovery across the four main
prospects at Splinter Rock.
Additional metallurgical samples will also be selected from the Phase 3 Splinter Rock drilling
program once assays have been received.
10 metallurgical samples from Grass Patch have also been sent to ANSTO for initial acid
leach tests.
Mineralogy
Mineralogy characterisation and testing is currently being conducted in conjunction with
characterisation
CSIRO, ANSTO and Murdoch University. The REE and clay host mineralogy is important for
in depth understanding of why higher recoveries can be achieved in particular Prospect areas.
Geometallurgy (GeoMet) refers to the practice of combining variables such as geology, grade,
volume, geochemistry, mineralogy and metallurgy to combine economic models with
exploration. The aim is to optimise the economics of a deposit to facilitate the identification
and ranking of preferred initial mining areas across clay hosted prospects. As Splinter Rock’s
GeoMet relationships are systemically mapped, clay areas containing the highest grades and
metallurgical recoveries of rare earth elements can be identified and targeted for advanced
stage work streams.
Various mineralogy testing methods are currently being undertaken including quantitative
XRF, SEM/EDS and QEMSCAN. Determining the mineralogical composition of the high-grade
areas is key to designing an economically successful processing facility.
6
Works
Works are proceeding to plan currently.
Progressing as
Planned
Corporate
ESG Foundation
Initiatives
Continue
OD6 recognises that implementing environmental, social and governance (ESG) practices in the
resources sector plays an important role in generating long-term sustainable outcomes. The
Company is pleased to announce the completion of foundational sustainability and ESG
initiatives during the quarter ended 30 June 2023. These actions are in line with stakeholder
expectations and the recommendations of internationally recognised sustainability reporting
organisations.
Sustainability Governance
To ensure Board oversight of ESG matters, OD6 has established an ESG Committee (Committee)
and an ESG Committee Charter (Charter) under the Corporate Governance Plan. As described
in the Charter, the primary purpose of the Committee is to support and advise the Board in
fulfilling the Company’s responsibilities concerning ESG matters.
OD6 has also formalised an ESG Policy to regulate and provide guidance to the Board on the
Company’s activities to minimise adverse workforce, community and environmental impacts
and ensure the Company conducts its operations sustainably.
Materiality Assessment
Identification of OD6’s ESG priorities is essential for establishing a strong ESG framework
foundation. As an initial step, a materiality workshop was conducted in October 2022 with
members of the OD6 Board and senior leadership team. Subsequently, a materiality assessment
was completed and a list of ESG topics considered material to OD6 and its stakeholders
complied. This process ensures company resources are focussed on top priorities, informing
OD6’s ESG performance indicators and disclosures.
7
Future Plans
Based on the materiality assessment results, OD6 has reviewed relevant data requirement and
is collecting information relating to material ESG topics. OD6 will report its sustainability
management approach, initiatives and performance. Key sustainability related metrics will also
be captured as part of the disclosure. The sustainability disclosure will form part of OD6’s
Annual Report for the year ended on 30 June 2023.
Cash Holdings
Securities on Issue
The Company had A$3.5M million of cash on hand at 30 June 2023
Fully Paid Ordinary Shares
102,450,745
Performance rights
OPTIONS
2,500,000
30,200,371
Fully paid ordinary shares include 47,435,249 shares escrowed until 22 June 2024
The 2,500,000 Performance Rights on issue are classified as restricted securities by the ASX and
are to be held in escrow until 22 June 2024.
Options on issue comprise:
•
22,050,371 Founder Options exercisable at A$0.30 on or before 31 October 2025.
•
3,850,000 Incentive Options exercisable at A$0.30 on or before 31 March 2026.
•
300,000 Contractor Options exercisable at A$0.30 on or before 13 April 2025.
•
1,500,000 Performance Options exercisable at A$0.50 on or before 31 March 2026.
•
2,500,000 Lead Manager Options exercisable at A$0.30 on or before 20 June 2025.
•
900,000 Performance Options exercisable at A$0.30 on or before 09 October 2026
As at 30 June 2023 none of the performance milestones of the Performance Rights had been
met, nor had any shares been issued on conversion of Performance Rights.
A summary of the performance milestones is outlined below:
Borrowings
CLASS
NUMBER
MILESTONE
EXPIRY DATE
A
1,000,000
The Company announcing to ASX a JORC Code compliant
inferred (or greater) Mineral Resource (as defined in the JORC
Code) of not less than 250,000,000 tonnes (of which at least
100,000,000 tonnes must be an indicated Mineral Resource),
grading a minimum of 800 ppm total rare earth oxides (TREO).
22 June 2024
B
1,500,000
Upon completion of a scoping study on a Project (prepared in
accordance with the guidelines prescribed by the JORC Code
and independently verified by an independent competent
person under the JORC Code) that demonstrates an internal
rate of return (IRR) of more than 20%.
22 June 2025
The Company has no borrowings.
8
Expenditure
Comparison to
In accordance with Listing Rule 5.3.4, as the June 2023 quarter was in a period covered by a
IPO Prospectus
“Use of Funds” statement in the IPO Prospectus, below is a comparison of the Company’s actual
expenditure to 30 June 2023 compared with the “Use of Funds” statement.
Use of Funds
USE OF FUNDS UNDER PROSPECTUS
under Prospectus
ACTUAL EXPENDITURE TO DATE
UNDER PROSPECTUS -
30 JUNE 2023
2 YEAR PERIOD (A$’000)
(A$’000)
Exploration on the Splinter Rock Project
5,802
2,432
Exploration on the Grass Patch Project
1,510
1,273
Expenses of the Offer
656
603
General working capital1
1,304
1,449
Totals
9,272
5,757
DATED 10 MAY 2022
1
EXPENDITURE ALLOCATED
Includes purchases of Property, Plant and Equipment
Exploration
Exploration and Evaluation expenditure during the quarter was A$898k. Expenditure included
Expenditure
drilling campaigns at Splinter Rock, assays, geophysics survey interpretation, site visits, heritage
surveys, track upgrades, drilling preparations, ANSTO metallurgical testing, mineralogy, CSIRO
research and geological investigation.
Related Party
During the quarter ended 30 June 2023, payments to related parties amounted to A$166k,
Transactions
comprising of Managing Director Fees, Non-Executive Director fees, Superannuation and
geological consulting fees to GeoSpy Pty Ltd, which is an entity controlled by Darren Holden.
9
Mineral Interests
Exploration
Schedule of Exploration Licenses (E) held end of June 2023 Quarter
Tenements
PROJECT
TENEMENT
NUMBER
HOLDER
STATUS
GRANTED
OWNERSHIP
Splinter Rock
E 63/2115
Odette Six Pty Ltd
Granted
4 Feb 22
100%
Splinter Rock
E 69/3904
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3905
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3907
Odette Six Pty Ltd
Granted
14 Feb 22
100%
Splinter Rock
E 69/3893
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Splinter Rock
E 69/3894
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Grass Patch
E 63/2185
Grass Patch Metals Pty Ltd
Granted
1 Mar 22
100%
Grass Patch
E 63/2151
Grass Patch Metals Pty Ltd
Granted
2 Dec 21
100%
Grass Patch
E 63/2152
Grass Patch Metals Pty Ltd
Granted
3 Dec 21
100%
Grass Patch
E 63/2154
Grass Patch Metals Pty Ltd
Granted
6 Dec 21
100%
Grass Patch
E 63/2153
Grass Patch Metals Pty Ltd
Application
-
100%
Grass Patch
E 74/693
Grass Patch Metals Pty Ltd
Application
-
100%
Figure 6: OD6 Granted and Application exploration Licenses in the Esperance region of Western Australia
10
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which have been crossreferenced to previous market announcements made by the Company. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the relevant market announcements.
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to be forecasts,
forward looking statements, or statements about the future matters for the purposes of the Corporations Act or any other
applicable law. Statements regarding plans with respect to OD6 Metals projects are forward looking statements and can generally
be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’,
‘should’, ‘will’ or similar expressions. There can be no assurance that the OD6 Metals plans for its projects will proceed as expected
and there can be no assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6
Metals actual results, performance, or achievements to differ from those referred to in this document. While the information
contained in this document has been prepared in good faith, there can be given no assurance or guarantee that the occurrence of
these events referred to in the document will occur as contemplated. Accordingly, to the maximum extent permitted by law, OD6
Metals and any of its affiliates and their directors, officers, employees, agents and advisors disclaim any liability whether direct or
indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of
the information in this document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or
implied in any forward-looking statement; and do not make any representation or warranty, express or implied, as to the accuracy,
reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any
event or results expressed or implied in any forward-looking statement; and disclaim all responsibility and liability for these
forward-looking statements (including, without limitation, liability for negligence).
This announcement has been authorised for release by the Board of OD6 Metals Ltd
11
About OD6 Metals
OD6 Metals is an Australian public company pursuing
exploration and development opportunities within the critical
mineral sector. The Company has successfully identified clay
hosted rare earths at its 100% owned Splinter Rock and Grass
Patch Projects, which are located in the Esperance-Goldfields
region of Western Australia - about 30 to 150km northeast of
the major port and town of Esperance.
Drilling and geological analysis at its flagship Splinter Rock has
shown widespread, thick, high-grade clay hosted REE deposits
that extend over hundreds of square kilometres. Metallurgical
testing using hydrochloric acid to leach the rare earths have
resulted in positive REE recoveries with optimisation ongoing.
The Company aims to delineate and define economic resources
and reserves of Rare Earth Elements (REE), in particular Neodymium (Nd) and Praseodymium (Pr), which can be
developed into a future revenue generating mine. Clay REE deposits are currently economically extracted in China,
which is the dominant world producer of REEs.
REE are becoming increasingly important in the global economy, with uses including advanced electronics and
permanent magnets in electric motors. As an example, a neodymium magnet used in a wind turbine or electric
vehicle motor is 18 times stronger than a standard ferrite magnet significantly increasing energy use efficiency.
As part of the exploration process the Company has entered into heritage agreements with Esperance Tjaltrjraak Native
Title Aboriginal Corporation and the Ngadju Native Title Aboriginal Corporation that serves to both enable exploration and
protect important cultural sites on Country.
Corporate Directory
Managing Director
Mr Brett Hazelden
Non-Executive Chairman
Dr Darren Holden
Non-Executive Director
Mr Piers Lewis
Non-Executive Director
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Mr Troy Cavanagh
Joint Company Secretary
Mr Joel Ives
Exploration Manager
Tim Jones
Contact
OD6 Metals Ltd
ACN 654 839 602
www.od6metals.com.au
Mail to: info@od6metals.com.au
Phone: +61 8 6189 8515
Level 1, 50 Kings Park Road, West Perth, WA 6005
PO Box 277, North Beach, WA 6920
PO Box 2009, Esperance, WA 6450
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
OD6 Metals Limited
ABN
Quarter ended (“current quarter”)
34 654 839 602
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(120)
(365)
(e) administration and corporate costs
(176)
(732)
-
-
53
115
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(243)
(982)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(3)
(21)
(c) property, plant and equipment
(64)
(80)
(d) exploration & evaluation
(898)
(3,412)
(e) investments
-
-
(f)
-
-
(a) entities
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(965)
(3,513)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(347)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
-
(347)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,723
8,357
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(243)
(982)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(965)
(3,513)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
(347)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
3,515
3,515
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,525
2,733
5.2
Call deposits
1,990
1,990
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,515
4,723
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
117
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
49
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as we